Compare 1,496+ routes, non-stop timings, T1/T2/T3 terminals & 14-day lowest fares (INR/USD/AED)
Track 500+ airlines by flight number with live terminal, gate & baggage belt
Check 7 kg / 15 kg airline baggage limits & calculate terminal arrival time
Check ₹5,000–₹20,000 DGCA / EU261 compensation & generate Nodal Officer claim
Spot your train's live GPS station, delay minutes, platform & coach position
Check real-time CNF, RAC, Waitlist & chart preparation status
Find 1st & 2nd (vacancy) chart times and remote charting station by stop
Calculate PRS verified CNF, RAC, WL, Tatkal & Vande Bharat Sleeper (72h/8h Gazette) refund
Find fastest & min-interchange routes, fares & timings across all 12 DMRC, Noida Aqua & Rapid Metro lines
The first reservation chart for Rewa Jbp Exp (11706) is prepared at Rewa (REWA) around 7:37 PM, with a second (vacancy) chart around 4:50 PM. 26 of 26 stations on the REWA to JBP route have published chart preparation times, listed station-by-station below. (नीचे अपना बोर्डिंग स्टेशन चुनकर हिंदी और English में पहला व दूसरा चार्ट समय देखें।)
बोर्डिंग स्टेशन के अनुसार पहला और दूसरा रिज़र्वेशन चार्ट बनने का सटीक समय
Your Boarding Station (1st Station Default) · आपका बोर्डिंग स्टेशन (पहला स्टेशन डिफ़ॉल्ट)
Select boarding station (English / हिंदी) to see exact 1st & 2nd chart time
रीवा (REWA) बोर्डिंग स्टेशन के लिए पहला और दूसरा रिज़र्वेशन चार्ट समय
7:37 PM
24-Hour IST: 19:37 hrs · Prev Day (Day 0)
Main chart when WL & RAC berths confirm, coach/seat numbers are allotted, and IRCTC SMS is sent.
इसी मुख्य चार्ट में WL और RAC टिकट कन्फर्म होते हैं व कोच/सीट नंबर SMS द्वारा मिलता है।
4:50 PM
24-Hour IST: 16:50 hrs · Day 1
Final chart (~30 mins before departure) locking Current Booking seats & TTE Hand-Held Terminal.
ट्रेन छूटने से ~30 मिनट पहले करंट बुकिंग (CURR_AVBL) और बची खाली सीटें लॉक होती हैं।
Prepared directly at Rewa (REWA) PRS charting hub.
इस स्टेशन का चार्ट सीधे रीवा (REWA) पर ही तैयार होता है।
Tap any station badge below to view its 1st & 2nd chart preparation timing above
Tap any boarding station row to view its details above · किसी भी स्टेशन पर क्लिक करके उसका चार्ट विवरण ऊपर देखें
| # | Boarding Station / बोर्डिंग स्टेशन | Arr / Dep · आगमन / प्रस्थान | Day & Dist · दिन व दूरी | 1st Chart / पहला चार्ट | 2nd Chart / दूसरा चार्ट | Charting Hub / चार्टिंग हब |
|---|---|---|---|---|---|---|
| 01 | Rewa · रीवाREWASelected 1st Boarding Station (Origin) · पहला बोर्डिंग स्टेशन (प्रारंभ) | Arr: Starts Dep: 14:00 | Day 1 0 km | 7:37 PM 19:37 · Prev Day (Day 0) | 4:50 PM 16:50 · Day 1 | REWA Self Charted |
| 02 | TURKI ROADTZR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:08 Dep: 14:10 | Day 1 12 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 03 | BAGAHAI ROADBGHI Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:18 Dep: 14:20 | Day 1 21 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 04 | HINAUTARAMBANHNM Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:28 Dep: 14:30 | Day 1 30 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 05 | SakariyaSKAR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:38 Dep: 14:40 | Day 1 37 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 06 | KAIMAKMA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:48 Dep: 14:50 | Day 1 44 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 07 | Satna · सतना जं.STA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 15:00 Dep: 15:05 | Day 1 50 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 08 | UnchheraUHR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 15:23 Dep: 15:25 | Day 1 71 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 09 | MaiharMYR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 15:33 Dep: 15:35 | Day 1 85 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 10 | BHADANPURBUU Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 15:48 Dep: 15:50 | Day 1 99 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 11 | GhunwaraGNWA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 15:57 Dep: 15:58 | Day 1 105 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 12 | AmdaraUDR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:03 Dep: 16:05 | Day 1 111 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 13 | Pakara RoadPKRD Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:18 Dep: 16:20 | Day 1 121 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 14 | JukehiJKE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:28 Dep: 16:30 | Day 1 131 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 15 | PATWARAPTWA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:38 Dep: 16:40 | Day 1 139 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 16 | Katni · कटनी जं.KTE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 17:00 Dep: 17:05 | Day 1 148 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 17 | Madavnagar RoadMDRR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 17:13 Dep: 17:15 | Day 1 153 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 18 | NiwarNWR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 17:28 Dep: 17:30 | Day 1 161 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 19 | SansarpurSNRR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 17:38 Dep: 17:40 | Day 1 169 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 20 | Sleemanabad RdSBD Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 17:48 Dep: 17:50 | Day 1 176 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 21 | DundiDDCE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 18:03 Dep: 18:05 | Day 1 185 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 22 | Sihora RoadSHR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 18:33 Dep: 18:35 | Day 1 200 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 23 | GosalpurGSPR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 18:48 Dep: 18:50 | Day 1 211 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 24 | DeoriDOE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 19:28 Dep: 19:30 | Day 1 222 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 25 | AdhartalADTL Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 20:08 Dep: 20:10 | Day 1 231 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
| 26 | Jabalpur · जबलपुरJBP Destination Terminal · अंतिम गंतव्य स्टेशन | Arr: 21:05 Dep: Ends | Day 1 239 km | 7:34 PM 19:34 · Prev Day (Day 0) | — · Day 1 | REWA Via Rewa |
1st Reservation Chart · पहला चार्ट कब बनता है?
Prepared at least 4 to 8 hours before departure (or the previous evening between 8:00 PM and 9:00 PM for morning trains departing before 12:00 PM). Most GNWL, RLWL, and RAC upgrades happen here.
ट्रेन छूटने से 4–8 घंटे पहले (और सुबह 12 बजे से पहले की ट्रेनों के लिए पिछली रात 8–9 बजे के बीच) पहला चार्ट तैयार होता है। ज़्यादातर वेटिंग (WL) व RAC टिकट इसी समय कन्फर्म होते हैं।
2nd (Vacancy) Chart · दूसरा वैकेंसी चार्ट क्या है?
Prepared 15 to 30 minutes before train departure at the charting station. It locks Current Booking (CURR_AVBL) seats, last-minute cancellations, and syncs to the TTE's Hand-Held Terminal.
ट्रेन छूटने से 15–30 मिनट पहले दूसरा (फ़ाइनल वैकेंसी) चार्ट लॉक होता है। इसमें करंट बुकिंग और अंतिम समय में रद्द हुई सीटें अपडेट होकर TTE के टैबलेट (HHT) पर जाती हैं।
Remote Charting Hub · रिमोट चार्टिंग स्टेशन क्यों ज़रूरी है?
Smaller or downstream halts do not prepare a separate chart; their quota is merged into an upstream Remote Charting Hub. Your ticket status locks when that upstream hub prepares its chart!
छोटे या आगे के स्टेशनों का अलग चार्ट नहीं बनता—उनका कोटा पिछले बड़े चार्टिंग हब (Remote Hub) से जुड़ा होता है, इसलिए आपका टिकट उसी बड़े स्टेशन के चार्ट समय पर लॉक हो जाता है!
Key charting summary, 1st & 2nd reservation chart locks, and remote charting hubs for Train 11706.
Complete station-by-station reservation chart preparation table from Rewa (REWA) to Jabalpur (JBP).
| # | Boarding Station | Day | Arr / Dep | 1st Reservation Chart | 2nd (Vacancy) Chart | Charting Station (Hub) |
|---|---|---|---|---|---|---|
| 1 | RewaREWA1st Boarding · Origin 0 km from origin | Day 1 |
At the origin station Rewa (REWA), the 1st reservation chart for Train 11706 (Rewa Jbp Exp) is prepared around 7:37 PM, and the 2nd (vacancy) chart is locked around 4:50 PM before its 2:00 PM departure.
Train 11706 (REWA to JBP) is divided into 1 charting zone: Rewa (REWA — 1st Chart 7:37 PM, 2nd Chart 4:50 PM).
On Train 11706, downstream stations mapped to an upstream remote charting hub include: TURKI ROAD (TZR → charted at Rewa REWA around 7:34 PM), BAGAHAI ROAD (BGHI → charted at Rewa REWA around 7:34 PM), HINAUTARAMBAN (HNM → charted at Rewa REWA around 7:34 PM), Sakariya (SKAR → charted at Rewa REWA around 7:34 PM). Always check your boarding station's assigned Charting Hub in the table above so you know the exact hour your WL/RAC ticket locks.
Check station-by-station reservation chart timings and remote charting hubs for major Indian Railways trains.
Calculate exact CRIS PRS bank refund with Double ₹5 Rounding before or after 7:37 PM chart lock for Confirmed (CNF), RAC, Waitlist (WL), or Tatkal tickets.
The first reservation chart for Rewa Jbp Exp (11706) is prepared at Rewa (REWA) around 7:37 PM, with a second (vacancy) chart around 4:50 PM. 26 of 26 stations on the REWA to JBP route have published chart preparation times, listed station-by-station below.
हिंदी में जानकारी (Chart Time Summary in Hindi):
ट्रेन 11706 Rewa Jbp Exp के प्रारंभिक स्टेशन Rewa (REWA) का पहला चार्ट लगभग 7:37 PM और दूसरा वैकेंसी चार्ट 4:50 PM पर तैयार होता है। बीच के स्टेशनों का समय ऊपर बोर्डिंग स्टेशन चुनकर देखें।
Once your boarding station's chart is prepared, verify your final coach & berth on our 10-Digit IRCTC PNR Status Checker or track the train on 11706 Rewa Jbp Exp Live Running Status.
Arr: Origin Dep: 14:00 |
| 7:37 PM 19:37 IST · Prev Day (Day 0) |
| 4:50 PM 16:50 IST · Day 1 |
Rewa (REWA) Primary Charting Hub |
| 2 | TURKI ROADTZR 12 km from origin | Day 1 | Arr: 14:08 Dep: 14:10 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 3 | BAGAHAI ROADBGHI 21 km from origin | Day 1 | Arr: 14:18 Dep: 14:20 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 4 | HINAUTARAMBANHNM 30 km from origin | Day 1 | Arr: 14:28 Dep: 14:30 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 5 | SakariyaSKAR 37 km from origin | Day 1 | Arr: 14:38 Dep: 14:40 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 6 | KAIMAKMA 44 km from origin | Day 1 | Arr: 14:48 Dep: 14:50 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 7 | SatnaSTA 50 km from origin | Day 1 | Arr: 15:00 Dep: 15:05 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 8 | UnchheraUHR 71 km from origin | Day 1 | Arr: 15:23 Dep: 15:25 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 9 | MaiharMYR 85 km from origin | Day 1 | Arr: 15:33 Dep: 15:35 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 10 | BHADANPURBUU 99 km from origin | Day 1 | Arr: 15:48 Dep: 15:50 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 11 | GhunwaraGNWA 105 km from origin | Day 1 | Arr: 15:57 Dep: 15:58 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 12 | AmdaraUDR 111 km from origin | Day 1 | Arr: 16:03 Dep: 16:05 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 13 | Pakara RoadPKRD 121 km from origin | Day 1 | Arr: 16:18 Dep: 16:20 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 14 | JukehiJKE 131 km from origin | Day 1 | Arr: 16:28 Dep: 16:30 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 15 | PATWARAPTWA 139 km from origin | Day 1 | Arr: 16:38 Dep: 16:40 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 16 | KatniKTE 148 km from origin | Day 1 | Arr: 17:00 Dep: 17:05 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 17 | Madavnagar RoadMDRR 153 km from origin | Day 1 | Arr: 17:13 Dep: 17:15 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 18 | NiwarNWR 161 km from origin | Day 1 | Arr: 17:28 Dep: 17:30 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 19 | SansarpurSNRR 169 km from origin | Day 1 | Arr: 17:38 Dep: 17:40 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 20 | Sleemanabad RdSBD 176 km from origin | Day 1 | Arr: 17:48 Dep: 17:50 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 21 | DundiDDCE 185 km from origin | Day 1 | Arr: 18:03 Dep: 18:05 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 22 | Sihora RoadSHR 200 km from origin | Day 1 | Arr: 18:33 Dep: 18:35 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 23 | GosalpurGSPR 211 km from origin | Day 1 | Arr: 18:48 Dep: 18:50 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 24 | DeoriDOE 222 km from origin | Day 1 | Arr: 19:28 Dep: 19:30 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 25 | AdhartalADTL 231 km from origin | Day 1 | Arr: 20:08 Dep: 20:10 | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
| 26 | JabalpurJBPDestination 239 km from origin | Day 1 | Arr: 21:05 Dep: End | 7:34 PM 19:34 IST · Prev Day (Day 0) | — IST · Day 1 | Rewa (REWA) Remote Hub (REWA) |
Yes. Right after the 1st reservation chart is prepared (7:37 PM at REWA), any remaining vacant berths open under IRCTC Current Booking until the 2nd (vacancy) chart locks at 4:50 PM.
If your WL or RAC ticket on 11706 does not clear during the 1st chart (7:37 PM), it remains eligible for last-minute cancellation upgrades in the 2nd vacancy chart (4:50 PM). Fully waitlisted e-tickets after the 2nd chart are automatically cancelled and refunded by IRCTC.
Once your boarding station's chart is prepared, enter your 10-digit PNR on TravelAdda's PNR Status page to view your final coach and berth number, or open the 11706 Live Running Status page to track real-time delays, platform numbers, and coach position from the engine.
ट्रेन 11706 (Rewa Jbp Exp) के प्रारंभिक स्टेशन Rewa (REWA) पर पहला रिज़र्वेशन चार्ट लगभग 7:37 PM बजे और दूसरा (वैकेंसी) चार्ट लगभग 4:50 PM बजे तैयार होता है। बीच के बोर्डिंग स्टेशनों का सटीक पहला और दूसरा चार्ट समय देखने के लिए ऊपर बोर्डिंग स्टेशन चुनें (English / हिंदी)।
Express · 1st & 2nd Chart Schedule