Compare 1,496+ routes, non-stop timings, T1/T2/T3 terminals & 14-day lowest fares (INR/USD/AED)
Track 500+ airlines by flight number with live terminal, gate & baggage belt
Check 7 kg / 15 kg airline baggage limits & calculate terminal arrival time
Check ₹5,000–₹20,000 DGCA / EU261 compensation & generate Nodal Officer claim
Spot your train's live GPS station, delay minutes, platform & coach position
Check real-time CNF, RAC, Waitlist & chart preparation status
Find 1st & 2nd (vacancy) chart times and remote charting station by stop
Calculate PRS verified CNF, RAC, WL, Tatkal & Vande Bharat Sleeper (72h/8h Gazette) refund
Find fastest & min-interchange routes, fares & timings across all 12 DMRC, Noida Aqua & Rapid Metro lines
The first reservation chart for Silchar Kanchanjungha Express (13175) is prepared at Sealdah (SDAH) around 8:00 PM, with a second (vacancy) chart around 6:20 AM. 41 of 41 stations on the SDAH to SCL route have published chart preparation times, listed station-by-station below. (नीचे अपना बोर्डिंग स्टेशन चुनकर हिंदी और English में पहला व दूसरा चार्ट समय देखें।)
बोर्डिंग स्टेशन के अनुसार पहला और दूसरा रिज़र्वेशन चार्ट बनने का सटीक समय
Your Boarding Station (1st Station Default) · आपका बोर्डिंग स्टेशन (पहला स्टेशन डिफ़ॉल्ट)
Select boarding station (English / हिंदी) to see exact 1st & 2nd chart time
सियालदह (SDAH) बोर्डिंग स्टेशन के लिए पहला और दूसरा रिज़र्वेशन चार्ट समय
8:00 PM
24-Hour IST: 20:00 hrs · Prev Day (Day 0)
Main chart when WL & RAC berths confirm, coach/seat numbers are allotted, and IRCTC SMS is sent.
इसी मुख्य चार्ट में WL और RAC टिकट कन्फर्म होते हैं व कोच/सीट नंबर SMS द्वारा मिलता है।
6:20 AM
24-Hour IST: 06:20 hrs · Day 1
Final chart (~30 mins before departure) locking Current Booking seats & TTE Hand-Held Terminal.
ट्रेन छूटने से ~30 मिनट पहले करंट बुकिंग (CURR_AVBL) और बची खाली सीटें लॉक होती हैं।
Prepared directly at Sealdah (SDAH) PRS charting hub.
इस स्टेशन का चार्ट सीधे सियालदह (SDAH) पर ही तैयार होता है।
Tap any station badge below to view its 1st & 2nd chart preparation timing above
Tap any boarding station row to view its details above · किसी भी स्टेशन पर क्लिक करके उसका चार्ट विवरण ऊपर देखें
| # | Boarding Station / बोर्डिंग स्टेशन | Arr / Dep · आगमन / प्रस्थान | Day & Dist · दिन व दूरी | 1st Chart / पहला चार्ट | 2nd Chart / दूसरा चार्ट | Charting Hub / चार्टिंग हब |
|---|---|---|---|---|---|---|
| 01 | Sealdah · सियालदहSDAHSelected 1st Boarding Station (Origin) · पहला बोर्डिंग स्टेशन (प्रारंभ) | Arr: Starts Dep: 06:50 | Day 1 0 km | 8:00 PM 20:00 · Prev Day (Day 0) | 6:20 AM 06:20 · Day 1 | SDAH Self Charted |
| 02 | DakhineswarDAKE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 07:06 Dep: 07:08 | Day 1 12.9 km | 8:00 PM 20:00 · Prev Day (Day 0) | 6:20 AM 06:20 · Day 1 | SDAH Via Sealdah |
| 03 | BardhamanBWN Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 08:34 Dep: 08:36 | Day 1 101.9 km | 8:00 PM 20:00 · Prev Day (Day 0) | 6:20 AM 06:20 · Day 1 | SDAH Via Sealdah |
| 04 | Bolpur S NiktnBHP Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 09:23 Dep: 09:28 | Day 1 153.8 km | 8:00 PM 20:00 · Prev Day (Day 0) | 8:58 AM 08:58 · Day 1 | BHP Self Charted |
| 05 | Ahmadpur JnAMP Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 09:46 Dep: 09:48 | Day 1 173.3 km | 8:00 PM 20:00 · Prev Day (Day 0) | 8:58 AM 08:58 · Day 1 | BHP Via Bolpur S Niktn |
| 06 | SainthiaSNT Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 10:00 Dep: 10:02 | Day 1 186.4 km | 8:00 PM 20:00 · Prev Day (Day 0) | 8:58 AM 08:58 · Day 1 | BHP Via Bolpur S Niktn |
| 07 | Rampur HatRPH Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 10:25 Dep: 10:27 | Day 1 214.4 km | 8:00 PM 20:00 · Prev Day (Day 0) | 9:57 AM 09:57 · Day 1 | RPH Self Charted |
| 08 | MuraraiMRR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 10:52 Dep: 10:54 | Day 1 244.9 km | 8:00 PM 20:00 · Prev Day (Day 0) | 9:57 AM 09:57 · Day 1 | RPH Via Rampur Hat |
| 09 | PakurPKR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 11:15 Dep: 11:17 | Day 1 267.1 km | 8:00 PM 20:00 · Prev Day (Day 0) | 9:57 AM 09:57 · Day 1 | RPH Via Rampur Hat |
| 10 | New Farakka JnNFK Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 12:40 Dep: 12:42 | Day 1 303.3 km | 8:42 AM 08:42 · Day 1 | 12:12 PM 12:12 · Day 1 | NFK Self Charted |
| 11 | Malda TownMLDT Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 13:30 Dep: 13:40 | Day 1 338.5 km | 8:42 AM 08:42 · Day 1 | 12:12 PM 12:12 · Day 1 | NFK Via New Farakka Jn |
| 12 | SamsiSM Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:13 Dep: 14:15 | Day 1 373.2 km | 8:42 AM 08:42 · Day 1 | 12:12 PM 12:12 · Day 1 | NFK Via New Farakka Jn |
| 13 | HarischandrpurHCR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:32 Dep: 14:34 | Day 1 393.8 km | 10:34 AM 10:34 · Day 1 | 2:04 PM 14:04 · Day 1 | HCR Self Charted |
| 14 | Azamnagar RoadAZR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:48 Dep: 14:50 | Day 1 415.7 km | 10:34 AM 10:34 · Day 1 | 2:04 PM 14:04 · Day 1 | HCR Via Harischandrpur |
| 15 | Barsoi JnBOE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 15:08 Dep: 15:10 | Day 1 429.2 km | 10:34 AM 10:34 · Day 1 | 2:04 PM 14:04 · Day 1 | HCR Via Harischandrpur |
| 16 | DalkolhaDLK Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 15:30 Dep: 15:32 | Day 1 458.2 km | 11:32 AM 11:32 · Day 1 | 3:02 PM 15:02 · Day 1 | DLK Self Charted |
| 17 | KishanganjKNE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:08 Dep: 16:10 | Day 1 486.7 km | 11:32 AM 11:32 · Day 1 | 3:02 PM 15:02 · Day 1 | DLK Via Dalkolha |
| 18 | Aluabari RoadAUB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:33 Dep: 16:35 | Day 1 517.3 km | 11:32 AM 11:32 · Day 1 | 3:02 PM 15:02 · Day 1 | DLK Via Dalkolha |
| 19 | New Jalpaiguri · न्यू जलपाईगुड़ीNJP Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 17:55 Dep: 18:05 | Day 1 573.9 km | 2:05 PM 14:05 · Day 1 | 5:35 PM 17:35 · Day 1 | NJP Self Charted |
| 20 | Jalpaiguri RoadJPE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 18:38 Dep: 18:40 | Day 1 607.5 km | 2:05 PM 14:05 · Day 1 | 5:35 PM 17:35 · Day 1 | NJP Via New Jalpaiguri |
| 21 | DhupguriDQG Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 19:13 Dep: 19:15 | Day 1 639.4 km | 2:05 PM 14:05 · Day 1 | 5:35 PM 17:35 · Day 1 | NJP Via New Jalpaiguri |
| 22 | FalakataFLK Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 19:35 Dep: 19:37 | Day 1 661.6 km | 3:37 PM 15:37 · Day 1 | 7:07 PM 19:07 · Day 1 | FLK Self Charted |
| 23 | New Cooch BeharNCB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 20:10 Dep: 20:15 | Day 1 699.4 km | 3:37 PM 15:37 · Day 1 | 7:07 PM 19:07 · Day 1 | FLK Via Falakata |
| 24 | New AlipurduarNOQ Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 20:35 Dep: 20:40 | Day 1 718.2 km | 3:37 PM 15:37 · Day 1 | 7:07 PM 19:07 · Day 1 | FLK Via Falakata |
| 25 | KamakhyaguriKAMG Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 20:58 Dep: 21:00 | Day 1 738.3 km | 5:00 PM 17:00 · Day 1 | 8:30 PM 20:30 · Day 1 | KAMG Self Charted |
| 26 | Gossaigaon HatGOGH Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 21:20 Dep: 21:22 | Day 1 764 km | 5:00 PM 17:00 · Day 1 | 8:30 PM 20:30 · Day 1 | KAMG Via Kamakhyaguri |
| 27 | Fakiragram JnFKM Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 21:40 Dep: 21:42 | Day 1 787.1 km | 5:00 PM 17:00 · Day 1 | 8:30 PM 20:30 · Day 1 | KAMG Via Kamakhyaguri |
| 28 | KokrajharKOJ Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 21:53 Dep: 21:55 | Day 1 797 km | 5:55 PM 17:55 · Day 1 | 9:25 PM 21:25 · Day 1 | KOJ Self Charted |
| 29 | BasugaonBSGN Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 22:10 Dep: 22:12 | Day 1 812.9 km | 5:55 PM 17:55 · Day 1 | 9:25 PM 21:25 · Day 1 | KOJ Via Kokrajhar |
| 30 | New BongaigaonNBQ Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 22:50 Dep: 23:00 | Day 1 824.7 km | 5:55 PM 17:55 · Day 1 | 9:25 PM 21:25 · Day 1 | KOJ Via Kokrajhar |
| 31 | Barpeta RoadBPRD Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 23:30 Dep: 23:35 | Day 1 868.8 km | 7:35 PM 19:35 · Day 1 | 11:05 PM 23:05 · Day 1 | BPRD Self Charted |
| 32 | Rangiya JnRNY Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 00:25 Dep: 00:30 | Day 2 933.8 km | 7:35 PM 19:35 · Day 1 (Prior Day) | 11:05 PM 23:05 · Day 1 (Prior Day) | BPRD Via Barpeta Road |
| 33 | Kamakhya · कामाख्या जं.KYQ Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 02:20 Dep: 02:25 | Day 2 974.8 km | 7:35 PM 19:35 · Day 1 (Prior Day) | 11:05 PM 23:05 · Day 1 (Prior Day) | BPRD Via Barpeta Road |
| 34 | Guwahati · गुवाहाटीGHY Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 02:40 Dep: 02:50 | Day 2 981.5 km | 10:50 PM 22:50 · Day 1 (Prior Day) | 2:20 AM 02:20 · Day 2 | GHY Self Charted |
| 35 | LankaLKA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 04:55 Dep: 04:57 | Day 2 1131.5 km | 10:50 PM 22:50 · Day 1 (Prior Day) | 2:20 AM 02:20 · Day 2 | GHY Via Guwahati |
| 36 | Lumding JnLMG Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 06:20 Dep: 06:35 | Day 2 1162 km | 10:50 PM 22:50 · Day 1 (Prior Day) | 2:20 AM 02:20 · Day 2 | GHY Via Guwahati |
| 37 | MahurMXR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 09:02 Dep: 09:04 | Day 2 1250.6 km | 8:00 PM 20:00 · Day 1 (Prior Day) | 8:34 AM 08:34 · Day 2 | MXR Self Charted |
| 38 | New HaflongNHLG Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 09:20 Dep: 09:25 | Day 2 1260.4 km | 8:00 PM 20:00 · Day 1 (Prior Day) | 8:34 AM 08:34 · Day 2 | MXR Via Mahur |
| 39 | BiharaBHZ Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 11:25 Dep: 11:27 | Day 2 1315.6 km | 8:00 PM 20:00 · Day 1 (Prior Day) | 8:34 AM 08:34 · Day 2 | MXR Via Mahur |
| 40 | Badarpur JnBPB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 12:30 Dep: 12:40 | Day 2 1331.2 km | 8:40 AM 08:40 · Day 2 | 12:10 PM 12:10 · Day 2 | BPB Self Charted |
| 41 | SilcharSCL Destination Terminal · अंतिम गंतव्य स्टेशन | Arr: 14:40 Dep: Ends | Day 1 1360.7 km | 8:40 AM 08:40 · Day 2 | 12:10 PM 12:10 · Day 2 | BPB Via Badarpur Jn |
1st Reservation Chart · पहला चार्ट कब बनता है?
Prepared at least 4 to 8 hours before departure (or the previous evening between 8:00 PM and 9:00 PM for morning trains departing before 12:00 PM). Most GNWL, RLWL, and RAC upgrades happen here.
ट्रेन छूटने से 4–8 घंटे पहले (और सुबह 12 बजे से पहले की ट्रेनों के लिए पिछली रात 8–9 बजे के बीच) पहला चार्ट तैयार होता है। ज़्यादातर वेटिंग (WL) व RAC टिकट इसी समय कन्फर्म होते हैं।
2nd (Vacancy) Chart · दूसरा वैकेंसी चार्ट क्या है?
Prepared 15 to 30 minutes before train departure at the charting station. It locks Current Booking (CURR_AVBL) seats, last-minute cancellations, and syncs to the TTE's Hand-Held Terminal.
ट्रेन छूटने से 15–30 मिनट पहले दूसरा (फ़ाइनल वैकेंसी) चार्ट लॉक होता है। इसमें करंट बुकिंग और अंतिम समय में रद्द हुई सीटें अपडेट होकर TTE के टैबलेट (HHT) पर जाती हैं।
Remote Charting Hub · रिमोट चार्टिंग स्टेशन क्यों ज़रूरी है?
Smaller or downstream halts do not prepare a separate chart; their quota is merged into an upstream Remote Charting Hub. Your ticket status locks when that upstream hub prepares its chart!
छोटे या आगे के स्टेशनों का अलग चार्ट नहीं बनता—उनका कोटा पिछले बड़े चार्टिंग हब (Remote Hub) से जुड़ा होता है, इसलिए आपका टिकट उसी बड़े स्टेशन के चार्ट समय पर लॉक हो जाता है!
Key charting summary, 1st & 2nd reservation chart locks, and remote charting hubs for Train 13175.
Complete station-by-station reservation chart preparation table from Sealdah (SDAH) to Silchar (SCL).
| # | Boarding Station | Day | Arr / Dep | 1st Reservation Chart | 2nd (Vacancy) Chart | Charting Station (Hub) |
|---|---|---|---|---|---|---|
| 1 | SealdahSDAH1st Boarding · Origin 0 km from origin | Day 1 |
At the origin station Sealdah (SDAH), the 1st reservation chart for Train 13175 (Silchar Kanchanjungha Express) is prepared around 8:00 PM, and the 2nd (vacancy) chart is locked around 6:20 AM before its 6:50 AM departure.
Train 13175 (SDAH to SCL) is divided into 14 charting zones: Sealdah (SDAH — 1st Chart 8:00 PM, 2nd Chart 6:20 AM); Bolpur S Niktn (BHP — 1st Chart 8:00 PM, 2nd Chart 8:58 AM); Rampur Hat (RPH — 1st Chart 8:00 PM, 2nd Chart 9:57 AM); New Farakka Jn (NFK — 1st Chart 8:42 AM, 2nd Chart 12:12 PM); Harischandrpur (HCR — 1st Chart 10:34 AM, 2nd Chart 2:04 PM); Dalkolha (DLK — 1st Chart 11:32 AM, 2nd Chart 3:02 PM); New Jalpaiguri (NJP — 1st Chart 2:05 PM, 2nd Chart 5:35 PM); Falakata (FLK — 1st Chart 3:37 PM, 2nd Chart 7:07 PM); Kamakhyaguri (KAMG — 1st Chart 5:00 PM, 2nd Chart 8:30 PM); Kokrajhar (KOJ — 1st Chart 5:55 PM, 2nd Chart 9:25 PM); Barpeta Road (BPRD — 1st Chart 7:35 PM, 2nd Chart 11:05 PM); Guwahati (GHY — 1st Chart 10:50 PM, 2nd Chart 2:20 AM); Mahur (MXR — 1st Chart 8:00 PM, 2nd Chart 8:34 AM); Badarpur Jn (BPB — 1st Chart 8:40 AM, 2nd Chart 12:10 PM).
Check station-by-station reservation chart timings and remote charting hubs for major Indian Railways trains.
Calculate exact CRIS PRS bank refund with Double ₹5 Rounding before or after 8:00 PM chart lock for Confirmed (CNF), RAC, Waitlist (WL), or Tatkal tickets.
The first reservation chart for Silchar Kanchanjungha Express (13175) is prepared at Sealdah (SDAH) around 8:00 PM, with a second (vacancy) chart around 6:20 AM. 41 of 41 stations on the SDAH to SCL route have published chart preparation times, listed station-by-station below.
हिंदी में जानकारी (Chart Time Summary in Hindi):
ट्रेन 13175 Silchar Kanchanjungha Express के प्रारंभिक स्टेशन Sealdah (SDAH) का पहला चार्ट लगभग 8:00 PM और दूसरा वैकेंसी चार्ट 6:20 AM पर तैयार होता है। बीच के स्टेशनों का समय ऊपर बोर्डिंग स्टेशन चुनकर देखें।
Once your boarding station's chart is prepared, verify your final coach & berth on our 10-Digit IRCTC PNR Status Checker or track the train on 13175 Silchar Kanchanjungha Express Live Running Status.
Arr: Origin Dep: 06:50 |
| 8:00 PM 20:00 IST · Prev Day (Day 0) |
| 6:20 AM 06:20 IST · Day 1 |
Sealdah (SDAH) Primary Charting Hub |
| 2 | DakhineswarDAKE 12.9 km from origin | Day 1 | Arr: 07:06 Dep: 07:08 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 6:20 AM 06:20 IST · Day 1 | Sealdah (SDAH) Remote Hub (SDAH) |
| 3 | BardhamanBWN 101.9 km from origin | Day 1 | Arr: 08:34 Dep: 08:36 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 6:20 AM 06:20 IST · Day 1 | Sealdah (SDAH) Remote Hub (SDAH) |
| 4 | Bolpur S NiktnBHP 153.8 km from origin | Day 1 | Arr: 09:23 Dep: 09:28 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 8:58 AM 08:58 IST · Day 1 | Bolpur S Niktn (BHP) Primary Charting Hub |
| 5 | Ahmadpur JnAMP 173.3 km from origin | Day 1 | Arr: 09:46 Dep: 09:48 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 8:58 AM 08:58 IST · Day 1 | Bolpur S Niktn (BHP) Remote Hub (BHP) |
| 6 | SainthiaSNT 186.4 km from origin | Day 1 | Arr: 10:00 Dep: 10:02 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 8:58 AM 08:58 IST · Day 1 | Bolpur S Niktn (BHP) Remote Hub (BHP) |
| 7 | Rampur HatRPH 214.4 km from origin | Day 1 | Arr: 10:25 Dep: 10:27 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 9:57 AM 09:57 IST · Day 1 | Rampur Hat (RPH) Primary Charting Hub |
| 8 | MuraraiMRR 244.9 km from origin | Day 1 | Arr: 10:52 Dep: 10:54 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 9:57 AM 09:57 IST · Day 1 | Rampur Hat (RPH) Remote Hub (RPH) |
| 9 | PakurPKR 267.1 km from origin | Day 1 | Arr: 11:15 Dep: 11:17 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 9:57 AM 09:57 IST · Day 1 | Rampur Hat (RPH) Remote Hub (RPH) |
| 10 | New Farakka JnNFK 303.3 km from origin | Day 1 | Arr: 12:40 Dep: 12:42 | 8:42 AM 08:42 IST · Day 1 | 12:12 PM 12:12 IST · Day 1 | New Farakka Jn (NFK) Primary Charting Hub |
| 11 | Malda TownMLDT 338.5 km from origin | Day 1 | Arr: 13:30 Dep: 13:40 | 8:42 AM 08:42 IST · Day 1 | 12:12 PM 12:12 IST · Day 1 | New Farakka Jn (NFK) Remote Hub (NFK) |
| 12 | SamsiSM 373.2 km from origin | Day 1 | Arr: 14:13 Dep: 14:15 | 8:42 AM 08:42 IST · Day 1 | 12:12 PM 12:12 IST · Day 1 | New Farakka Jn (NFK) Remote Hub (NFK) |
| 13 | HarischandrpurHCR 393.8 km from origin | Day 1 | Arr: 14:32 Dep: 14:34 | 10:34 AM 10:34 IST · Day 1 | 2:04 PM 14:04 IST · Day 1 | Harischandrpur (HCR) Primary Charting Hub |
| 14 | Azamnagar RoadAZR 415.7 km from origin | Day 1 | Arr: 14:48 Dep: 14:50 | 10:34 AM 10:34 IST · Day 1 | 2:04 PM 14:04 IST · Day 1 | Harischandrpur (HCR) Remote Hub (HCR) |
| 15 | Barsoi JnBOE 429.2 km from origin | Day 1 | Arr: 15:08 Dep: 15:10 | 10:34 AM 10:34 IST · Day 1 | 2:04 PM 14:04 IST · Day 1 | Harischandrpur (HCR) Remote Hub (HCR) |
| 16 | DalkolhaDLK 458.2 km from origin | Day 1 | Arr: 15:30 Dep: 15:32 | 11:32 AM 11:32 IST · Day 1 | 3:02 PM 15:02 IST · Day 1 | Dalkolha (DLK) Primary Charting Hub |
| 17 | KishanganjKNE 486.7 km from origin | Day 1 | Arr: 16:08 Dep: 16:10 | 11:32 AM 11:32 IST · Day 1 | 3:02 PM 15:02 IST · Day 1 | Dalkolha (DLK) Remote Hub (DLK) |
| 18 | Aluabari RoadAUB 517.3 km from origin | Day 1 | Arr: 16:33 Dep: 16:35 | 11:32 AM 11:32 IST · Day 1 | 3:02 PM 15:02 IST · Day 1 | Dalkolha (DLK) Remote Hub (DLK) |
| 19 | New JalpaiguriNJP 573.9 km from origin | Day 1 | Arr: 17:55 Dep: 18:05 | 2:05 PM 14:05 IST · Day 1 | 5:35 PM 17:35 IST · Day 1 | New Jalpaiguri (NJP) Primary Charting Hub |
| 20 | Jalpaiguri RoadJPE 607.5 km from origin | Day 1 | Arr: 18:38 Dep: 18:40 | 2:05 PM 14:05 IST · Day 1 | 5:35 PM 17:35 IST · Day 1 | New Jalpaiguri (NJP) Remote Hub (NJP) |
| 21 | DhupguriDQG 639.4 km from origin | Day 1 | Arr: 19:13 Dep: 19:15 | 2:05 PM 14:05 IST · Day 1 | 5:35 PM 17:35 IST · Day 1 | New Jalpaiguri (NJP) Remote Hub (NJP) |
| 22 | FalakataFLK 661.6 km from origin | Day 1 | Arr: 19:35 Dep: 19:37 | 3:37 PM 15:37 IST · Day 1 | 7:07 PM 19:07 IST · Day 1 | Falakata (FLK) Primary Charting Hub |
| 23 | New Cooch BeharNCB 699.4 km from origin | Day 1 | Arr: 20:10 Dep: 20:15 | 3:37 PM 15:37 IST · Day 1 | 7:07 PM 19:07 IST · Day 1 | Falakata (FLK) Remote Hub (FLK) |
| 24 | New AlipurduarNOQ 718.2 km from origin | Day 1 | Arr: 20:35 Dep: 20:40 | 3:37 PM 15:37 IST · Day 1 | 7:07 PM 19:07 IST · Day 1 | Falakata (FLK) Remote Hub (FLK) |
| 25 | KamakhyaguriKAMG 738.3 km from origin | Day 1 | Arr: 20:58 Dep: 21:00 | 5:00 PM 17:00 IST · Day 1 | 8:30 PM 20:30 IST · Day 1 | Kamakhyaguri (KAMG) Primary Charting Hub |
| 26 | Gossaigaon HatGOGH 764 km from origin | Day 1 | Arr: 21:20 Dep: 21:22 | 5:00 PM 17:00 IST · Day 1 | 8:30 PM 20:30 IST · Day 1 | Kamakhyaguri (KAMG) Remote Hub (KAMG) |
| 27 | Fakiragram JnFKM 787.1 km from origin | Day 1 | Arr: 21:40 Dep: 21:42 | 5:00 PM 17:00 IST · Day 1 | 8:30 PM 20:30 IST · Day 1 | Kamakhyaguri (KAMG) Remote Hub (KAMG) |
| 28 | KokrajharKOJ 797 km from origin | Day 1 | Arr: 21:53 Dep: 21:55 | 5:55 PM 17:55 IST · Day 1 | 9:25 PM 21:25 IST · Day 1 | Kokrajhar (KOJ) Primary Charting Hub |
| 29 | BasugaonBSGN 812.9 km from origin | Day 1 | Arr: 22:10 Dep: 22:12 | 5:55 PM 17:55 IST · Day 1 | 9:25 PM 21:25 IST · Day 1 | Kokrajhar (KOJ) Remote Hub (KOJ) |
| 30 | New BongaigaonNBQ 824.7 km from origin | Day 1 | Arr: 22:50 Dep: 23:00 | 5:55 PM 17:55 IST · Day 1 | 9:25 PM 21:25 IST · Day 1 | Kokrajhar (KOJ) Remote Hub (KOJ) |
| 31 | Barpeta RoadBPRD 868.8 km from origin | Day 1 | Arr: 23:30 Dep: 23:35 | 7:35 PM 19:35 IST · Day 1 | 11:05 PM 23:05 IST · Day 1 | Barpeta Road (BPRD) Primary Charting Hub |
| 32 | Rangiya JnRNY 933.8 km from origin | Day 2 | Arr: 00:25 Dep: 00:30 | 7:35 PM 19:35 IST · Day 1 (Prior Day) | 11:05 PM 23:05 IST · Day 1 (Prior Day) | Barpeta Road (BPRD) Remote Hub (BPRD) |
| 33 | KamakhyaKYQ 974.8 km from origin | Day 2 | Arr: 02:20 Dep: 02:25 | 7:35 PM 19:35 IST · Day 1 (Prior Day) | 11:05 PM 23:05 IST · Day 1 (Prior Day) | Barpeta Road (BPRD) Remote Hub (BPRD) |
| 34 | GuwahatiGHY 981.5 km from origin | Day 2 | Arr: 02:40 Dep: 02:50 | 10:50 PM 22:50 IST · Day 1 (Prior Day) | 2:20 AM 02:20 IST · Day 2 | Guwahati (GHY) Primary Charting Hub |
| 35 | LankaLKA 1131.5 km from origin | Day 2 | Arr: 04:55 Dep: 04:57 | 10:50 PM 22:50 IST · Day 1 (Prior Day) | 2:20 AM 02:20 IST · Day 2 | Guwahati (GHY) Remote Hub (GHY) |
| 36 | Lumding JnLMG 1162 km from origin | Day 2 | Arr: 06:20 Dep: 06:35 | 10:50 PM 22:50 IST · Day 1 (Prior Day) | 2:20 AM 02:20 IST · Day 2 | Guwahati (GHY) Remote Hub (GHY) |
| 37 | MahurMXR 1250.6 km from origin | Day 2 | Arr: 09:02 Dep: 09:04 | 8:00 PM 20:00 IST · Day 1 (Prior Day) | 8:34 AM 08:34 IST · Day 2 | Mahur (MXR) Primary Charting Hub |
| 38 | New HaflongNHLG 1260.4 km from origin | Day 2 | Arr: 09:20 Dep: 09:25 | 8:00 PM 20:00 IST · Day 1 (Prior Day) | 8:34 AM 08:34 IST · Day 2 | Mahur (MXR) Remote Hub (MXR) |
| 39 | BiharaBHZ 1315.6 km from origin | Day 2 | Arr: 11:25 Dep: 11:27 | 8:00 PM 20:00 IST · Day 1 (Prior Day) | 8:34 AM 08:34 IST · Day 2 | Mahur (MXR) Remote Hub (MXR) |
| 40 | Badarpur JnBPB 1331.2 km from origin | Day 2 | Arr: 12:30 Dep: 12:40 | 8:40 AM 08:40 IST · Day 2 | 12:10 PM 12:10 IST · Day 2 | Badarpur Jn (BPB) Primary Charting Hub |
| 41 | SilcharSCLDestination 1360.7 km from origin | Day 1 | Arr: 14:40 Dep: End | 8:40 AM 08:40 IST · Day 2 | 12:10 PM 12:10 IST · Day 2 | Badarpur Jn (BPB) Remote Hub (BPB) |
On Train 13175, downstream stations mapped to an upstream remote charting hub include: Dakhineswar (DAKE → charted at Sealdah SDAH around 8:00 PM), Bardhaman (BWN → charted at Sealdah SDAH around 8:00 PM), Ahmadpur Jn (AMP → charted at Bolpur S Niktn BHP around 8:00 PM), Sainthia (SNT → charted at Bolpur S Niktn BHP around 8:00 PM). Always check your boarding station's assigned Charting Hub in the table above so you know the exact hour your WL/RAC ticket locks.
Yes. Right after the 1st reservation chart is prepared (8:00 PM at SDAH), any remaining vacant berths open under IRCTC Current Booking until the 2nd (vacancy) chart locks at 6:20 AM.
If your WL or RAC ticket on 13175 does not clear during the 1st chart (8:00 PM), it remains eligible for last-minute cancellation upgrades in the 2nd vacancy chart (6:20 AM). Fully waitlisted e-tickets after the 2nd chart are automatically cancelled and refunded by IRCTC.
Once your boarding station's chart is prepared, enter your 10-digit PNR on TravelAdda's PNR Status page to view your final coach and berth number, or open the 13175 Live Running Status page to track real-time delays, platform numbers, and coach position from the engine.
ट्रेन 13175 (Silchar Kanchanjungha Express) के प्रारंभिक स्टेशन Sealdah (SDAH) पर पहला रिज़र्वेशन चार्ट लगभग 8:00 PM बजे और दूसरा (वैकेंसी) चार्ट लगभग 6:20 AM बजे तैयार होता है। बीच के बोर्डिंग स्टेशनों का सटीक पहला और दूसरा चार्ट समय देखने के लिए ऊपर बोर्डिंग स्टेशन चुनें (English / हिंदी)।
Express · 1st & 2nd Chart Schedule