Compare 1,496+ routes, non-stop timings, T1/T2/T3 terminals & 14-day lowest fares (INR/USD/AED)
Track 500+ airlines by flight number with live terminal, gate & baggage belt
Check 7 kg / 15 kg airline baggage limits & calculate terminal arrival time
Check ₹5,000–₹20,000 DGCA / EU261 compensation & generate Nodal Officer claim
Spot your train's live GPS station, delay minutes, platform & coach position
Check real-time CNF, RAC, Waitlist & chart preparation status
Find 1st & 2nd (vacancy) chart times and remote charting station by stop
Calculate PRS verified CNF, RAC, WL, Tatkal & Vande Bharat Sleeper (72h/8h Gazette) refund
Find fastest & min-interchange routes, fares & timings across all 12 DMRC, Noida Aqua & Rapid Metro lines
The first reservation chart for Shri Ganganagar Intercity Express (14816) is prepared at Rishikesh (RKSH) around 8:45 AM, with a second (vacancy) chart around 12:15 PM. 23 of 23 stations on the RKSH to SGNR route have published chart preparation times, listed station-by-station below. (नीचे अपना बोर्डिंग स्टेशन चुनकर हिंदी और English में पहला व दूसरा चार्ट समय देखें।)
बोर्डिंग स्टेशन के अनुसार पहला और दूसरा रिज़र्वेशन चार्ट बनने का सटीक समय
Your Boarding Station (1st Station Default) · आपका बोर्डिंग स्टेशन (पहला स्टेशन डिफ़ॉल्ट)
Select boarding station (English / हिंदी) to see exact 1st & 2nd chart time
ऋषिकेश (RKSH) बोर्डिंग स्टेशन के लिए पहला और दूसरा रिज़र्वेशन चार्ट समय
8:45 AM
24-Hour IST: 08:45 hrs · Day 1
Main chart when WL & RAC berths confirm, coach/seat numbers are allotted, and IRCTC SMS is sent.
इसी मुख्य चार्ट में WL और RAC टिकट कन्फर्म होते हैं व कोच/सीट नंबर SMS द्वारा मिलता है।
12:15 PM
24-Hour IST: 12:15 hrs · Day 1
Final chart (~30 mins before departure) locking Current Booking seats & TTE Hand-Held Terminal.
ट्रेन छूटने से ~30 मिनट पहले करंट बुकिंग (CURR_AVBL) और बची खाली सीटें लॉक होती हैं।
Prepared directly at Rishikesh (RKSH) PRS charting hub.
इस स्टेशन का चार्ट सीधे ऋषिकेश (RKSH) पर ही तैयार होता है।
Tap any station badge below to view its 1st & 2nd chart preparation timing above
Tap any boarding station row to view its details above · किसी भी स्टेशन पर क्लिक करके उसका चार्ट विवरण ऊपर देखें
| # | Boarding Station / बोर्डिंग स्टेशन | Arr / Dep · आगमन / प्रस्थान | Day & Dist · दिन व दूरी | 1st Chart / पहला चार्ट | 2nd Chart / दूसरा चार्ट | Charting Hub / चार्टिंग हब |
|---|---|---|---|---|---|---|
| 01 | Rishikesh · ऋषिकेशRKSHSelected 1st Boarding Station (Origin) · पहला बोर्डिंग स्टेशन (प्रारंभ) | Arr: Starts Dep: 12:45 | Day 1 0 km | 8:45 AM 08:45 · Day 1 | 12:15 PM 12:15 · Day 1 | RKSH Self Charted |
| 02 | Haridwar · हरिद्वार जं.HW Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:10 Dep: 14:15 | Day 1 22.6 km | 8:45 AM 08:45 · Day 1 | 12:15 PM 12:15 · Day 1 | RKSH Via Rishikesh |
| 03 | RoorkeeRK Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 15:08 Dep: 15:13 | Day 1 64.3 km | 8:45 AM 08:45 · Day 1 | 12:15 PM 12:15 · Day 1 | RKSH Via Rishikesh |
| 04 | Saharanpur JnSRE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:00 Dep: 16:05 | Day 1 99 km | 12:05 PM 12:05 · Day 1 | 3:35 PM 15:35 · Day 1 | SRE Self Charted |
| 05 | Yamunanagar JagadhriYJUD Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:31 Dep: 16:33 | Day 1 129.1 km | 12:05 PM 12:05 · Day 1 | 3:35 PM 15:35 · Day 1 | SRE Via Saharanpur Jn |
| 06 | Jagadhri WshopJUDW Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:39 Dep: 16:41 | Day 1 134.1 km | 12:05 PM 12:05 · Day 1 | 3:35 PM 15:35 · Day 1 | SRE Via Saharanpur Jn |
| 07 | MustafabadMFB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 16:52 Dep: 16:54 | Day 1 146.5 km | 12:54 PM 12:54 · Day 1 | 4:24 PM 16:24 · Day 1 | MFB Self Charted |
| 08 | BararaRAA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 17:18 Dep: 17:20 | Day 1 155.4 km | 12:54 PM 12:54 · Day 1 | 4:24 PM 16:24 · Day 1 | MFB Via Mustafabad |
| 09 | Ambala Cantt · अंबाला कैंटUMB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 17:55 Dep: 18:02 | Day 1 180.1 km | 12:54 PM 12:54 · Day 1 | 4:24 PM 16:24 · Day 1 | MFB Via Mustafabad |
| 10 | Ambala CityUBC Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 18:16 Dep: 18:18 | Day 1 187.7 km | 2:18 PM 14:18 · Day 1 | 5:48 PM 17:48 · Day 1 | UBC Self Charted |
| 11 | Rajpura JnRPJ Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 18:33 Dep: 18:35 | Day 1 208 km | 2:18 PM 14:18 · Day 1 | 5:48 PM 17:48 · Day 1 | UBC Via Ambala City |
| 12 | PatialaPTA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 19:23 Dep: 19:25 | Day 1 233.4 km | 2:18 PM 14:18 · Day 1 | 5:48 PM 17:48 · Day 1 | UBC Via Ambala City |
| 13 | NabhaNBA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 19:47 Dep: 19:49 | Day 1 258.9 km | 3:49 PM 15:49 · Day 1 | 7:19 PM 19:19 · Day 1 | NBA Self Charted |
| 14 | Dhuri JnDUI Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 20:14 Dep: 20:16 | Day 1 285.9 km | 3:49 PM 15:49 · Day 1 | 7:19 PM 19:19 · Day 1 | NBA Via Nabha |
| 15 | BarnalaBNN Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 20:38 Dep: 20:40 | Day 1 316.6 km | 3:49 PM 15:49 · Day 1 | 7:19 PM 19:19 · Day 1 | NBA Via Nabha |
| 16 | TapaTAPA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 20:56 Dep: 20:58 | Day 1 335.8 km | 4:58 PM 16:58 · Day 1 | 8:28 PM 20:28 · Day 1 | TAPA Self Charted |
| 17 | Rampura PhulPUL Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 21:09 Dep: 21:11 | Day 1 348.9 km | 4:58 PM 16:58 · Day 1 | 8:28 PM 20:28 · Day 1 | TAPA Via Tapa |
| 18 | BhuchchuBCU Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 21:23 Dep: 21:25 | Day 1 364 km | 4:58 PM 16:58 · Day 1 | 8:28 PM 20:28 · Day 1 | TAPA Via Tapa |
| 19 | BathindaBTI Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 21:45 Dep: 21:50 | Day 1 381.4 km | 5:50 PM 17:50 · Day 1 | 9:20 PM 21:20 · Day 1 | BTI Self Charted |
| 20 | GiddarbahaGDB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 22:10 Dep: 22:12 | Day 1 409 km | 5:50 PM 17:50 · Day 1 | 9:20 PM 21:20 · Day 1 | BTI Via Bathinda |
| 21 | MaloutMOT Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 22:26 Dep: 22:28 | Day 1 425.1 km | 5:50 PM 17:50 · Day 1 | 9:20 PM 21:20 · Day 1 | BTI Via Bathinda |
| 22 | AboharABS Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 22:50 Dep: 22:52 | Day 1 454.7 km | 6:52 PM 18:52 · Day 1 | 10:22 PM 22:22 · Day 1 | ABS Self Charted |
| 23 | Shri GanganagarSGNR Destination Terminal · अंतिम गंतव्य स्टेशन | Arr: 00:10 Dep: Ends | Day 1 507.7 km | 6:52 PM 18:52 · Day 1 | 10:22 PM 22:22 · Day 1 | ABS Via Abohar |
1st Reservation Chart · पहला चार्ट कब बनता है?
Prepared at least 4 to 8 hours before departure (or the previous evening between 8:00 PM and 9:00 PM for morning trains departing before 12:00 PM). Most GNWL, RLWL, and RAC upgrades happen here.
ट्रेन छूटने से 4–8 घंटे पहले (और सुबह 12 बजे से पहले की ट्रेनों के लिए पिछली रात 8–9 बजे के बीच) पहला चार्ट तैयार होता है। ज़्यादातर वेटिंग (WL) व RAC टिकट इसी समय कन्फर्म होते हैं।
2nd (Vacancy) Chart · दूसरा वैकेंसी चार्ट क्या है?
Prepared 15 to 30 minutes before train departure at the charting station. It locks Current Booking (CURR_AVBL) seats, last-minute cancellations, and syncs to the TTE's Hand-Held Terminal.
ट्रेन छूटने से 15–30 मिनट पहले दूसरा (फ़ाइनल वैकेंसी) चार्ट लॉक होता है। इसमें करंट बुकिंग और अंतिम समय में रद्द हुई सीटें अपडेट होकर TTE के टैबलेट (HHT) पर जाती हैं।
Remote Charting Hub · रिमोट चार्टिंग स्टेशन क्यों ज़रूरी है?
Smaller or downstream halts do not prepare a separate chart; their quota is merged into an upstream Remote Charting Hub. Your ticket status locks when that upstream hub prepares its chart!
छोटे या आगे के स्टेशनों का अलग चार्ट नहीं बनता—उनका कोटा पिछले बड़े चार्टिंग हब (Remote Hub) से जुड़ा होता है, इसलिए आपका टिकट उसी बड़े स्टेशन के चार्ट समय पर लॉक हो जाता है!
Key charting summary, 1st & 2nd reservation chart locks, and remote charting hubs for Train 14816.
Complete station-by-station reservation chart preparation table from Rishikesh (RKSH) to Shri Ganganagar (SGNR).
| # | Boarding Station | Day | Arr / Dep | 1st Reservation Chart | 2nd (Vacancy) Chart | Charting Station (Hub) |
|---|---|---|---|---|---|---|
| 1 | RishikeshRKSH1st Boarding · Origin 0 km from origin | Day 1 |
At the origin station Rishikesh (RKSH), the 1st reservation chart for Train 14816 (Shri Ganganagar Intercity Express) is prepared around 8:45 AM, and the 2nd (vacancy) chart is locked around 12:15 PM before its 12:45 PM departure.
Train 14816 (RKSH to SGNR) is divided into 8 charting zones: Rishikesh (RKSH — 1st Chart 8:45 AM, 2nd Chart 12:15 PM); Saharanpur Jn (SRE — 1st Chart 12:05 PM, 2nd Chart 3:35 PM); Mustafabad (MFB — 1st Chart 12:54 PM, 2nd Chart 4:24 PM); Ambala City (UBC — 1st Chart 2:18 PM, 2nd Chart 5:48 PM); Nabha (NBA — 1st Chart 3:49 PM, 2nd Chart 7:19 PM); Tapa (TAPA — 1st Chart 4:58 PM, 2nd Chart 8:28 PM); Bathinda (BTI — 1st Chart 5:50 PM, 2nd Chart 9:20 PM); Abohar (ABS — 1st Chart 6:52 PM, 2nd Chart 10:22 PM).
On Train 14816, downstream stations mapped to an upstream remote charting hub include: Haridwar (HW → charted at Rishikesh RKSH around 8:45 AM), Roorkee (RK → charted at Rishikesh RKSH around 8:45 AM), Yamunanagar Jagadhri (YJUD → charted at Saharanpur Jn SRE around 12:05 PM), Jagadhri Wshop (JUDW → charted at Saharanpur Jn SRE around 12:05 PM). Always check your boarding station's assigned Charting Hub in the table above so you know the exact hour your WL/RAC ticket locks.
Check station-by-station reservation chart timings and remote charting hubs for major Indian Railways trains.
Calculate exact CRIS PRS bank refund with Double ₹5 Rounding before or after 8:45 AM chart lock for Confirmed (CNF), RAC, Waitlist (WL), or Tatkal tickets.
The first reservation chart for Shri Ganganagar Intercity Express (14816) is prepared at Rishikesh (RKSH) around 8:45 AM, with a second (vacancy) chart around 12:15 PM. 23 of 23 stations on the RKSH to SGNR route have published chart preparation times, listed station-by-station below.
हिंदी में जानकारी (Chart Time Summary in Hindi):
ट्रेन 14816 Shri Ganganagar Intercity Express के प्रारंभिक स्टेशन Rishikesh (RKSH) का पहला चार्ट लगभग 8:45 AM और दूसरा वैकेंसी चार्ट 12:15 PM पर तैयार होता है। बीच के स्टेशनों का समय ऊपर बोर्डिंग स्टेशन चुनकर देखें।
Once your boarding station's chart is prepared, verify your final coach & berth on our 10-Digit IRCTC PNR Status Checker or track the train on 14816 Shri Ganganagar Intercity Express Live Running Status.
Arr: Origin Dep: 12:45 |
| 8:45 AM 08:45 IST · Day 1 |
| 12:15 PM 12:15 IST · Day 1 |
Rishikesh (RKSH) Primary Charting Hub |
| 2 | HaridwarHW 22.6 km from origin | Day 1 | Arr: 14:10 Dep: 14:15 | 8:45 AM 08:45 IST · Day 1 | 12:15 PM 12:15 IST · Day 1 | Rishikesh (RKSH) Remote Hub (RKSH) |
| 3 | RoorkeeRK 64.3 km from origin | Day 1 | Arr: 15:08 Dep: 15:13 | 8:45 AM 08:45 IST · Day 1 | 12:15 PM 12:15 IST · Day 1 | Rishikesh (RKSH) Remote Hub (RKSH) |
| 4 | Saharanpur JnSRE 99 km from origin | Day 1 | Arr: 16:00 Dep: 16:05 | 12:05 PM 12:05 IST · Day 1 | 3:35 PM 15:35 IST · Day 1 | Saharanpur Jn (SRE) Primary Charting Hub |
| 5 | Yamunanagar JagadhriYJUD 129.1 km from origin | Day 1 | Arr: 16:31 Dep: 16:33 | 12:05 PM 12:05 IST · Day 1 | 3:35 PM 15:35 IST · Day 1 | Saharanpur Jn (SRE) Remote Hub (SRE) |
| 6 | Jagadhri WshopJUDW 134.1 km from origin | Day 1 | Arr: 16:39 Dep: 16:41 | 12:05 PM 12:05 IST · Day 1 | 3:35 PM 15:35 IST · Day 1 | Saharanpur Jn (SRE) Remote Hub (SRE) |
| 7 | MustafabadMFB 146.5 km from origin | Day 1 | Arr: 16:52 Dep: 16:54 | 12:54 PM 12:54 IST · Day 1 | 4:24 PM 16:24 IST · Day 1 | Mustafabad (MFB) Primary Charting Hub |
| 8 | BararaRAA 155.4 km from origin | Day 1 | Arr: 17:18 Dep: 17:20 | 12:54 PM 12:54 IST · Day 1 | 4:24 PM 16:24 IST · Day 1 | Mustafabad (MFB) Remote Hub (MFB) |
| 9 | Ambala CanttUMB 180.1 km from origin | Day 1 | Arr: 17:55 Dep: 18:02 | 12:54 PM 12:54 IST · Day 1 | 4:24 PM 16:24 IST · Day 1 | Mustafabad (MFB) Remote Hub (MFB) |
| 10 | Ambala CityUBC 187.7 km from origin | Day 1 | Arr: 18:16 Dep: 18:18 | 2:18 PM 14:18 IST · Day 1 | 5:48 PM 17:48 IST · Day 1 | Ambala City (UBC) Primary Charting Hub |
| 11 | Rajpura JnRPJ 208 km from origin | Day 1 | Arr: 18:33 Dep: 18:35 | 2:18 PM 14:18 IST · Day 1 | 5:48 PM 17:48 IST · Day 1 | Ambala City (UBC) Remote Hub (UBC) |
| 12 | PatialaPTA 233.4 km from origin | Day 1 | Arr: 19:23 Dep: 19:25 | 2:18 PM 14:18 IST · Day 1 | 5:48 PM 17:48 IST · Day 1 | Ambala City (UBC) Remote Hub (UBC) |
| 13 | NabhaNBA 258.9 km from origin | Day 1 | Arr: 19:47 Dep: 19:49 | 3:49 PM 15:49 IST · Day 1 | 7:19 PM 19:19 IST · Day 1 | Nabha (NBA) Primary Charting Hub |
| 14 | Dhuri JnDUI 285.9 km from origin | Day 1 | Arr: 20:14 Dep: 20:16 | 3:49 PM 15:49 IST · Day 1 | 7:19 PM 19:19 IST · Day 1 | Nabha (NBA) Remote Hub (NBA) |
| 15 | BarnalaBNN 316.6 km from origin | Day 1 | Arr: 20:38 Dep: 20:40 | 3:49 PM 15:49 IST · Day 1 | 7:19 PM 19:19 IST · Day 1 | Nabha (NBA) Remote Hub (NBA) |
| 16 | TapaTAPA 335.8 km from origin | Day 1 | Arr: 20:56 Dep: 20:58 | 4:58 PM 16:58 IST · Day 1 | 8:28 PM 20:28 IST · Day 1 | Tapa (TAPA) Primary Charting Hub |
| 17 | Rampura PhulPUL 348.9 km from origin | Day 1 | Arr: 21:09 Dep: 21:11 | 4:58 PM 16:58 IST · Day 1 | 8:28 PM 20:28 IST · Day 1 | Tapa (TAPA) Remote Hub (TAPA) |
| 18 | BhuchchuBCU 364 km from origin | Day 1 | Arr: 21:23 Dep: 21:25 | 4:58 PM 16:58 IST · Day 1 | 8:28 PM 20:28 IST · Day 1 | Tapa (TAPA) Remote Hub (TAPA) |
| 19 | BathindaBTI 381.4 km from origin | Day 1 | Arr: 21:45 Dep: 21:50 | 5:50 PM 17:50 IST · Day 1 | 9:20 PM 21:20 IST · Day 1 | Bathinda (BTI) Primary Charting Hub |
| 20 | GiddarbahaGDB 409 km from origin | Day 1 | Arr: 22:10 Dep: 22:12 | 5:50 PM 17:50 IST · Day 1 | 9:20 PM 21:20 IST · Day 1 | Bathinda (BTI) Remote Hub (BTI) |
| 21 | MaloutMOT 425.1 km from origin | Day 1 | Arr: 22:26 Dep: 22:28 | 5:50 PM 17:50 IST · Day 1 | 9:20 PM 21:20 IST · Day 1 | Bathinda (BTI) Remote Hub (BTI) |
| 22 | AboharABS 454.7 km from origin | Day 1 | Arr: 22:50 Dep: 22:52 | 6:52 PM 18:52 IST · Day 1 | 10:22 PM 22:22 IST · Day 1 | Abohar (ABS) Primary Charting Hub |
| 23 | Shri GanganagarSGNRDestination 507.7 km from origin | Day 1 | Arr: 00:10 Dep: End | 6:52 PM 18:52 IST · Day 1 | 10:22 PM 22:22 IST · Day 1 | Abohar (ABS) Remote Hub (ABS) |
Yes. Right after the 1st reservation chart is prepared (8:45 AM at RKSH), any remaining vacant berths open under IRCTC Current Booking until the 2nd (vacancy) chart locks at 12:15 PM.
If your WL or RAC ticket on 14816 does not clear during the 1st chart (8:45 AM), it remains eligible for last-minute cancellation upgrades in the 2nd vacancy chart (12:15 PM). Fully waitlisted e-tickets after the 2nd chart are automatically cancelled and refunded by IRCTC.
Once your boarding station's chart is prepared, enter your 10-digit PNR on TravelAdda's PNR Status page to view your final coach and berth number, or open the 14816 Live Running Status page to track real-time delays, platform numbers, and coach position from the engine.
ट्रेन 14816 (Shri Ganganagar Intercity Express) के प्रारंभिक स्टेशन Rishikesh (RKSH) पर पहला रिज़र्वेशन चार्ट लगभग 8:45 AM बजे और दूसरा (वैकेंसी) चार्ट लगभग 12:15 PM बजे तैयार होता है। बीच के बोर्डिंग स्टेशनों का सटीक पहला और दूसरा चार्ट समय देखने के लिए ऊपर बोर्डिंग स्टेशन चुनें (English / हिंदी)।
Express · 1st & 2nd Chart Schedule