Compare 1,496+ routes, non-stop timings, T1/T2/T3 terminals & 14-day lowest fares (INR/USD/AED)
Track 500+ airlines by flight number with live terminal, gate & baggage belt
Check 7 kg / 15 kg airline baggage limits & calculate terminal arrival time
Check ₹5,000–₹20,000 DGCA / EU261 compensation & generate Nodal Officer claim
Spot your train's live GPS station, delay minutes, platform & coach position
Check real-time CNF, RAC, Waitlist & chart preparation status
Find 1st & 2nd (vacancy) chart times and remote charting station by stop
Calculate PRS verified CNF, RAC, WL, Tatkal & Vande Bharat Sleeper (72h/8h Gazette) refund
Find fastest & min-interchange routes, fares & timings across all 12 DMRC, Noida Aqua & Rapid Metro lines
The first reservation chart for Sbib Bsb S Fast (20963) is prepared at Palanpur Jn (PNU) around 12:56 PM, with a second (vacancy) chart around 10:40 PM. 18 of 20 stations on the SBIB to BSB route have published chart preparation times, listed station-by-station below; the remaining stations update closer to departure. (नीचे अपना बोर्डिंग स्टेशन चुनकर हिंदी और English में पहला व दूसरा चार्ट समय देखें।)
बोर्डिंग स्टेशन के अनुसार पहला और दूसरा रिज़र्वेशन चार्ट बनने का सटीक समय
Your Boarding Station (1st Station Default) · आपका बोर्डिंग स्टेशन (पहला स्टेशन डिफ़ॉल्ट)
Select boarding station (English / हिंदी) to see exact 1st & 2nd chart time
साबरमती (SBIB) बोर्डिंग स्टेशन के लिए पहला और दूसरा रिज़र्वेशन चार्ट समय
—
24-Hour IST: hrs · Day 1
Main chart when WL & RAC berths confirm, coach/seat numbers are allotted, and IRCTC SMS is sent.
इसी मुख्य चार्ट में WL और RAC टिकट कन्फर्म होते हैं व कोच/सीट नंबर SMS द्वारा मिलता है।
—
24-Hour IST: hrs · Day 1
Final chart (~30 mins before departure) locking Current Booking seats & TTE Hand-Held Terminal.
ट्रेन छूटने से ~30 मिनट पहले करंट बुकिंग (CURR_AVBL) और बची खाली सीटें लॉक होती हैं।
Prepared directly at Sabarmati Bg (SBIB) PRS charting hub.
इस स्टेशन का चार्ट सीधे साबरमती (SBIB) पर ही तैयार होता है।
Tap any station badge below to view its 1st & 2nd chart preparation timing above
Tap any boarding station row to view its details above · किसी भी स्टेशन पर क्लिक करके उसका चार्ट विवरण ऊपर देखें
| # | Boarding Station / बोर्डिंग स्टेशन | Arr / Dep · आगमन / प्रस्थान | Day & Dist · दिन व दूरी | 1st Chart / पहला चार्ट | 2nd Chart / दूसरा चार्ट | Charting Hub / चार्टिंग हब |
|---|---|---|---|---|---|---|
| 01 | Sabarmati Bg · साबरमतीSBIBSelected 1st Boarding Station (Origin) · पहला बोर्डिंग स्टेशन (प्रारंभ) | Arr: Starts Dep: 22:55 | Day 1 0 km | — · Day 1 | — · Day 1 | SBIB Self Charted |
| 02 | Mahesana JnMSH Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 23:45 Dep: 23:47 | Day 1 63 km | — · Day 1 | — · Day 1 | MSH Self Charted |
| 03 | Palanpur JnPNU Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 00:58 Dep: 01:00 | Day 2 128 km | 12:56 PM 12:56 · Day 1 (Prior Day) | 10:40 PM 22:40 · Day 1 (Prior Day) | SBIB Via Sabarmati Bg |
| 04 | Abu Road · आबू रोडABR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 01:35 Dep: 01:45 | Day 2 181 km | 5:45 PM 17:45 · Day 1 (Prior Day) | 1:30 AM 01:30 · Day 2 | ABR Self Charted |
| 05 | Falna · फालनाFA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 02:53 Dep: 02:55 | Day 2 280 km | 5:45 PM 17:45 · Day 1 (Prior Day) | 1:30 AM 01:30 · Day 2 | ABR Via Abu Road |
| 06 | Marwar JnMJ Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 03:55 Dep: 04:00 | Day 2 346 km | 5:45 PM 17:45 · Day 1 (Prior Day) | 1:30 AM 01:30 · Day 2 | ABR Via Abu Road |
| 07 | BeawarBER Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 05:03 Dep: 05:05 | Day 2 434 km | 5:45 PM 17:45 · Day 1 (Prior Day) | 1:30 AM 01:30 · Day 2 | ABR Via Abu Road |
| 08 | Ajmer Jn · अजमेर जं.AII Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 06:15 Dep: 06:25 | Day 2 486 km | 8:55 PM 20:55 · Day 1 (Prior Day) | 6:10 AM 06:10 · Day 2 | AII Self Charted |
| 09 | Jaipur · जयपुर जं.JP Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 09:00 Dep: 09:10 | Day 2 621 km | 9:01 PM 21:01 · Day 1 (Prior Day) | 8:55 AM 08:55 · Day 2 | JP Self Charted |
| 10 | AlwarAWR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 11:27 Dep: 11:30 | Day 2 771 km | 9:01 PM 21:01 · Day 1 (Prior Day) | 8:55 AM 08:55 · Day 2 | JP Via Jaipur |
| 11 | RewariRE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 12:40 Dep: 12:43 | Day 2 846 km | 9:01 PM 21:01 · Day 1 (Prior Day) | 8:55 AM 08:55 · Day 2 | JP Via Jaipur |
| 12 | GurgaonGGN Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 13:25 Dep: 13:27 | Day 2 897 km | 9:01 PM 21:01 · Day 1 (Prior Day) | 8:55 AM 08:55 · Day 2 | JP Via Jaipur |
| 13 | Old Delhi · पुरानी दिल्लीDLI Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 14:55 Dep: 15:10 | Day 2 928 km | 7:10 AM 07:10 · Day 2 | 2:55 PM 14:55 · Day 2 | DLI Self Charted |
| 14 | Moradabad · मुरादाबाद जं.MB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 18:00 Dep: 18:08 | Day 2 1089 km | 7:10 AM 07:10 · Day 2 | 2:55 PM 14:55 · Day 2 | DLI Via Old Delhi |
| 15 | Bareilly · बरेली जं.BE Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 19:30 Dep: 19:32 | Day 2 1179 km | 9:35 AM 09:35 · Day 2 | 7:17 PM 19:17 · Day 2 | BE Self Charted |
| 16 | Lucknow Nr · लखनऊ चारबागLKO Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 23:35 Dep: 23:45 | Day 2 1414 km | 1:55 PM 13:55 · Day 2 | 11:30 PM 23:30 · Day 2 | LKO Self Charted |
| 17 | Maharaja Bijli Pasi NihalgarhMBLP Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 01:01 Dep: 01:03 | Day 3 1504 km | 1:55 PM 13:55 · Day 2 (Prior Day) | 11:30 PM 23:30 · Day 2 (Prior Day) | LKO Via Lucknow Nr |
| 18 | SultanpurSLN Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 01:45 Dep: 01:50 | Day 3 1554 km | 1:55 PM 13:55 · Day 2 (Prior Day) | 11:30 PM 23:30 · Day 2 (Prior Day) | LKO Via Lucknow Nr |
| 19 | Jaunpur CityJOP Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 03:23 Dep: 03:25 | Day 3 1640 km | 1:55 PM 13:55 · Day 2 (Prior Day) | 11:30 PM 23:30 · Day 2 (Prior Day) | LKO Via Lucknow Nr |
| 20 | Varanasi Jn · वाराणसी जं.BSB Destination Terminal · अंतिम गंतव्य स्टेशन | Arr: 05:30 Dep: Ends | Day 3 1697 km | 1:55 PM 13:55 · Day 2 (Prior Day) | 11:30 PM 23:30 · Day 2 (Prior Day) | LKO Via Lucknow Nr |
1st Reservation Chart · पहला चार्ट कब बनता है?
Prepared at least 4 to 8 hours before departure (or the previous evening between 8:00 PM and 9:00 PM for morning trains departing before 12:00 PM). Most GNWL, RLWL, and RAC upgrades happen here.
ट्रेन छूटने से 4–8 घंटे पहले (और सुबह 12 बजे से पहले की ट्रेनों के लिए पिछली रात 8–9 बजे के बीच) पहला चार्ट तैयार होता है। ज़्यादातर वेटिंग (WL) व RAC टिकट इसी समय कन्फर्म होते हैं।
2nd (Vacancy) Chart · दूसरा वैकेंसी चार्ट क्या है?
Prepared 15 to 30 minutes before train departure at the charting station. It locks Current Booking (CURR_AVBL) seats, last-minute cancellations, and syncs to the TTE's Hand-Held Terminal.
ट्रेन छूटने से 15–30 मिनट पहले दूसरा (फ़ाइनल वैकेंसी) चार्ट लॉक होता है। इसमें करंट बुकिंग और अंतिम समय में रद्द हुई सीटें अपडेट होकर TTE के टैबलेट (HHT) पर जाती हैं।
Remote Charting Hub · रिमोट चार्टिंग स्टेशन क्यों ज़रूरी है?
Smaller or downstream halts do not prepare a separate chart; their quota is merged into an upstream Remote Charting Hub. Your ticket status locks when that upstream hub prepares its chart!
छोटे या आगे के स्टेशनों का अलग चार्ट नहीं बनता—उनका कोटा पिछले बड़े चार्टिंग हब (Remote Hub) से जुड़ा होता है, इसलिए आपका टिकट उसी बड़े स्टेशन के चार्ट समय पर लॉक हो जाता है!
Key charting summary, 1st & 2nd reservation chart locks, and remote charting hubs for Train 20963.
Complete station-by-station reservation chart preparation table from Sabarmati Bg (SBIB) to Varanasi Jn (BSB).
| # | Boarding Station | Day | Arr / Dep | 1st Reservation Chart | 2nd (Vacancy) Chart | Charting Station (Hub) |
|---|---|---|---|---|---|---|
| 1 | Sabarmati BgSBIB1st Boarding · Origin 0 km from origin | Day 1 |
At the origin station Sabarmati Bg (SBIB), the 1st reservation chart for Train 20963 (Sbib Bsb S Fast) is prepared around —, and the 2nd (vacancy) chart is locked around — before its 10:55 PM departure.
Train 20963 (SBIB to BSB) is divided into 8 charting zones: Sabarmati Bg (SBIB — 1st Chart —, 2nd Chart —); Mahesana Jn (MSH — 1st Chart —, 2nd Chart —); Abu Road (ABR — 1st Chart 5:45 PM, 2nd Chart 1:30 AM); Ajmer Jn (AII — 1st Chart 8:55 PM, 2nd Chart 6:10 AM); Jaipur (JP — 1st Chart 9:01 PM, 2nd Chart 8:55 AM); Old Delhi (DLI — 1st Chart 7:10 AM, 2nd Chart 2:55 PM); Bareilly (BE — 1st Chart 9:35 AM, 2nd Chart 7:17 PM); Lucknow Nr (LKO — 1st Chart 1:55 PM, 2nd Chart 11:30 PM).
On Train 20963, downstream stations mapped to an upstream remote charting hub include: Palanpur Jn (PNU → charted at Sabarmati Bg SBIB around 12:56 PM), Falna (FA → charted at Abu Road ABR around 5:45 PM), Marwar Jn (MJ → charted at Abu Road ABR around 5:45 PM), Beawar (BER → charted at Abu Road ABR around 5:45 PM). Always check your boarding station's assigned Charting Hub in the table above so you know the exact hour your WL/RAC ticket locks.
Check station-by-station reservation chart timings and remote charting hubs for major Indian Railways trains.
Calculate exact CRIS PRS bank refund with Double ₹5 Rounding before or after — chart lock for Confirmed (CNF), RAC, Waitlist (WL), or Tatkal tickets.
The first reservation chart for Sbib Bsb S Fast (20963) is prepared at Palanpur Jn (PNU) around 12:56 PM, with a second (vacancy) chart around 10:40 PM. 18 of 20 stations on the SBIB to BSB route have published chart preparation times, listed station-by-station below; the remaining stations update closer to departure.
हिंदी में जानकारी (Chart Time Summary in Hindi):
ट्रेन 20963 Sbib Bsb S Fast के प्रारंभिक स्टेशन Sabarmati Bg (SBIB) का पहला चार्ट लगभग — और दूसरा वैकेंसी चार्ट — पर तैयार होता है। बीच के स्टेशनों का समय ऊपर बोर्डिंग स्टेशन चुनकर देखें।
Once your boarding station's chart is prepared, verify your final coach & berth on our 10-Digit IRCTC PNR Status Checker or track the train on 20963 Sbib Bsb S Fast Live Running Status.
Arr: Origin Dep: 22:55 |
| — IST · Day 1 |
| — IST · Day 1 |
Sabarmati Bg (SBIB) Primary Charting Hub |
| 2 | Mahesana JnMSH 63 km from origin | Day 1 | Arr: 23:45 Dep: 23:47 | — IST · Day 1 | — IST · Day 1 | Mahesana Jn (MSH) Primary Charting Hub |
| 3 | Palanpur JnPNU 128 km from origin | Day 2 | Arr: 00:58 Dep: 01:00 | 12:56 PM 12:56 IST · Day 1 (Prior Day) | 10:40 PM 22:40 IST · Day 1 (Prior Day) | Sabarmati Bg (SBIB) Remote Hub (SBIB) |
| 4 | Abu RoadABR 181 km from origin | Day 2 | Arr: 01:35 Dep: 01:45 | 5:45 PM 17:45 IST · Day 1 (Prior Day) | 1:30 AM 01:30 IST · Day 2 | Abu Road (ABR) Primary Charting Hub |
| 5 | FalnaFA 280 km from origin | Day 2 | Arr: 02:53 Dep: 02:55 | 5:45 PM 17:45 IST · Day 1 (Prior Day) | 1:30 AM 01:30 IST · Day 2 | Abu Road (ABR) Remote Hub (ABR) |
| 6 | Marwar JnMJ 346 km from origin | Day 2 | Arr: 03:55 Dep: 04:00 | 5:45 PM 17:45 IST · Day 1 (Prior Day) | 1:30 AM 01:30 IST · Day 2 | Abu Road (ABR) Remote Hub (ABR) |
| 7 | BeawarBER 434 km from origin | Day 2 | Arr: 05:03 Dep: 05:05 | 5:45 PM 17:45 IST · Day 1 (Prior Day) | 1:30 AM 01:30 IST · Day 2 | Abu Road (ABR) Remote Hub (ABR) |
| 8 | Ajmer JnAII 486 km from origin | Day 2 | Arr: 06:15 Dep: 06:25 | 8:55 PM 20:55 IST · Day 1 (Prior Day) | 6:10 AM 06:10 IST · Day 2 | Ajmer Jn (AII) Primary Charting Hub |
| 9 | JaipurJP 621 km from origin | Day 2 | Arr: 09:00 Dep: 09:10 | 9:01 PM 21:01 IST · Day 1 (Prior Day) | 8:55 AM 08:55 IST · Day 2 | Jaipur (JP) Primary Charting Hub |
| 10 | AlwarAWR 771 km from origin | Day 2 | Arr: 11:27 Dep: 11:30 | 9:01 PM 21:01 IST · Day 1 (Prior Day) | 8:55 AM 08:55 IST · Day 2 | Jaipur (JP) Remote Hub (JP) |
| 11 | RewariRE 846 km from origin | Day 2 | Arr: 12:40 Dep: 12:43 | 9:01 PM 21:01 IST · Day 1 (Prior Day) | 8:55 AM 08:55 IST · Day 2 | Jaipur (JP) Remote Hub (JP) |
| 12 | GurgaonGGN 897 km from origin | Day 2 | Arr: 13:25 Dep: 13:27 | 9:01 PM 21:01 IST · Day 1 (Prior Day) | 8:55 AM 08:55 IST · Day 2 | Jaipur (JP) Remote Hub (JP) |
| 13 | Old DelhiDLI 928 km from origin | Day 2 | Arr: 14:55 Dep: 15:10 | 7:10 AM 07:10 IST · Day 2 | 2:55 PM 14:55 IST · Day 2 | Old Delhi (DLI) Primary Charting Hub |
| 14 | MoradabadMB 1089 km from origin | Day 2 | Arr: 18:00 Dep: 18:08 | 7:10 AM 07:10 IST · Day 2 | 2:55 PM 14:55 IST · Day 2 | Old Delhi (DLI) Remote Hub (DLI) |
| 15 | BareillyBE 1179 km from origin | Day 2 | Arr: 19:30 Dep: 19:32 | 9:35 AM 09:35 IST · Day 2 | 7:17 PM 19:17 IST · Day 2 | Bareilly (BE) Primary Charting Hub |
| 16 | Lucknow NrLKO 1414 km from origin | Day 2 | Arr: 23:35 Dep: 23:45 | 1:55 PM 13:55 IST · Day 2 | 11:30 PM 23:30 IST · Day 2 | Lucknow Nr (LKO) Primary Charting Hub |
| 17 | Maharaja Bijli Pasi NihalgarhMBLP 1504 km from origin | Day 3 | Arr: 01:01 Dep: 01:03 | 1:55 PM 13:55 IST · Day 2 (Prior Day) | 11:30 PM 23:30 IST · Day 2 (Prior Day) | Lucknow Nr (LKO) Remote Hub (LKO) |
| 18 | SultanpurSLN 1554 km from origin | Day 3 | Arr: 01:45 Dep: 01:50 | 1:55 PM 13:55 IST · Day 2 (Prior Day) | 11:30 PM 23:30 IST · Day 2 (Prior Day) | Lucknow Nr (LKO) Remote Hub (LKO) |
| 19 | Jaunpur CityJOP 1640 km from origin | Day 3 | Arr: 03:23 Dep: 03:25 | 1:55 PM 13:55 IST · Day 2 (Prior Day) | 11:30 PM 23:30 IST · Day 2 (Prior Day) | Lucknow Nr (LKO) Remote Hub (LKO) |
| 20 | Varanasi JnBSBDestination 1697 km from origin | Day 3 | Arr: 05:30 Dep: End | 1:55 PM 13:55 IST · Day 2 (Prior Day) | 11:30 PM 23:30 IST · Day 2 (Prior Day) | Lucknow Nr (LKO) Remote Hub (LKO) |
Yes. Right after the 1st reservation chart is prepared (— at SBIB), any remaining vacant berths open under IRCTC Current Booking until the 2nd (vacancy) chart locks at —.
If your WL or RAC ticket on 20963 does not clear during the 1st chart (—), it remains eligible for last-minute cancellation upgrades in the 2nd vacancy chart (—). Fully waitlisted e-tickets after the 2nd chart are automatically cancelled and refunded by IRCTC.
Once your boarding station's chart is prepared, enter your 10-digit PNR on TravelAdda's PNR Status page to view your final coach and berth number, or open the 20963 Live Running Status page to track real-time delays, platform numbers, and coach position from the engine.
ट्रेन 20963 (Sbib Bsb S Fast) के प्रारंभिक स्टेशन Sabarmati Bg (SBIB) पर पहला रिज़र्वेशन चार्ट लगभग — बजे और दूसरा (वैकेंसी) चार्ट लगभग — बजे तैयार होता है। बीच के बोर्डिंग स्टेशनों का सटीक पहला और दूसरा चार्ट समय देखने के लिए ऊपर बोर्डिंग स्टेशन चुनें (English / हिंदी)।
Superfast · 1st & 2nd Chart Schedule