Compare 1,496+ routes, non-stop timings, T1/T2/T3 terminals & 14-day lowest fares (INR/USD/AED)
Track 500+ airlines by flight number with live terminal, gate & baggage belt
Check 7 kg / 15 kg airline baggage limits & calculate terminal arrival time
Check ₹5,000–₹20,000 DGCA / EU261 compensation & generate Nodal Officer claim
Spot your train's live GPS station, delay minutes, platform & coach position
Check real-time CNF, RAC, Waitlist & chart preparation status
Find 1st & 2nd (vacancy) chart times and remote charting station by stop
Calculate PRS verified CNF, RAC, WL, Tatkal & Vande Bharat Sleeper (72h/8h Gazette) refund
Find fastest & min-interchange routes, fares & timings across all 12 DMRC, Noida Aqua & Rapid Metro lines
The first reservation chart for Gimb Bdts Sfast (22952) is prepared at Wankaner Jn (WKR) around 11:26 AM, with a second (vacancy) chart around 8:45 PM. 10 of 14 stations on the GIMB to BDTS route have published chart preparation times, listed station-by-station below; the remaining stations update closer to departure. (नीचे अपना बोर्डिंग स्टेशन चुनकर हिंदी और English में पहला व दूसरा चार्ट समय देखें।)
बोर्डिंग स्टेशन के अनुसार पहला और दूसरा रिज़र्वेशन चार्ट बनने का सटीक समय
Your Boarding Station (1st Station Default) · आपका बोर्डिंग स्टेशन (पहला स्टेशन डिफ़ॉल्ट)
Select boarding station (English / हिंदी) to see exact 1st & 2nd chart time
गांधीधाम जं. (GIMB) बोर्डिंग स्टेशन के लिए पहला और दूसरा रिज़र्वेशन चार्ट समय
—
24-Hour IST: hrs · Day 1
Main chart when WL & RAC berths confirm, coach/seat numbers are allotted, and IRCTC SMS is sent.
इसी मुख्य चार्ट में WL और RAC टिकट कन्फर्म होते हैं व कोच/सीट नंबर SMS द्वारा मिलता है।
—
24-Hour IST: hrs · Day 1
Final chart (~30 mins before departure) locking Current Booking seats & TTE Hand-Held Terminal.
ट्रेन छूटने से ~30 मिनट पहले करंट बुकिंग (CURR_AVBL) और बची खाली सीटें लॉक होती हैं।
Prepared directly at Gandhidham Bg (GIMB) PRS charting hub.
इस स्टेशन का चार्ट सीधे गांधीधाम जं. (GIMB) पर ही तैयार होता है।
Tap any station badge below to view its 1st & 2nd chart preparation timing above
Tap any boarding station row to view its details above · किसी भी स्टेशन पर क्लिक करके उसका चार्ट विवरण ऊपर देखें
| # | Boarding Station / बोर्डिंग स्टेशन | Arr / Dep · आगमन / प्रस्थान | Day & Dist · दिन व दूरी | 1st Chart / पहला चार्ट | 2nd Chart / दूसरा चार्ट | Charting Hub / चार्टिंग हब |
|---|---|---|---|---|---|---|
| 01 | Gandhidham Bg · गांधीधाम जं.GIMBSelected 1st Boarding Station (Origin) · पहला बोर्डिंग स्टेशन (प्रारंभ) | Arr: Starts Dep: 21:00 | Day 1 0 km | — · Day 1 | — · Day 1 | GIMB Self Charted |
| 02 | Bhachau BgBCOB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 21:30 Dep: 21:32 | Day 1 38 km | — · Day 1 | — · Day 1 | BCOB Self Charted |
| 03 | Samakhiali B GSIOB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 21:50 Dep: 21:52 | Day 1 53 km | — · Day 1 | — · Day 1 | SIOB Self Charted |
| 04 | MORBIMVI Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 23:32 Dep: 23:37 | Day 1 145 km | — · Day 1 | — · Day 1 | MVI Self Charted |
| 05 | Wankaner JnWKR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 00:20 Dep: 00:25 | Day 2 174 km | 11:26 AM 11:26 · Day 1 (Prior Day) | 8:45 PM 20:45 · Day 1 (Prior Day) | GIMB Via Gandhidham Bg |
| 06 | SurendranagarSUNR Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 01:27 Dep: 01:29 | Day 2 248 km | 11:26 AM 11:26 · Day 1 (Prior Day) | 8:45 PM 20:45 · Day 1 (Prior Day) | GIMB Via Gandhidham Bg |
| 07 | Viramgam JnVG Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 02:40 Dep: 02:42 | Day 2 314 km | 11:26 AM 11:26 · Day 1 (Prior Day) | 8:45 PM 20:45 · Day 1 (Prior Day) | GIMB Via Gandhidham Bg |
| 08 | Ahmedabad Jn · अहमदाबाद जं.ADI Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 03:50 Dep: 04:00 | Day 2 379 km | 6:01 PM 18:01 · Day 1 (Prior Day) | 3:45 AM 03:45 · Day 2 | ADI Self Charted |
| 09 | Vadodara Jn · वडोदरा जं.BRC Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 05:48 Dep: 05:53 | Day 2 479 km | 6:54 PM 18:54 · Day 1 (Prior Day) | 5:38 AM 05:38 · Day 2 | BRC Self Charted |
| 10 | Surat · सूरतST Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 07:40 Dep: 07:45 | Day 2 608 km | 8:02 PM 20:02 · Day 1 (Prior Day) | 7:30 AM 07:30 · Day 2 | ST Self Charted |
| 11 | Valsad · वलसाडBL Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 08:48 Dep: 08:50 | Day 2 676 km | 8:02 PM 20:02 · Day 1 (Prior Day) | 7:30 AM 07:30 · Day 2 | ST Via Surat |
| 12 | Vapi · वापीVAPI Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 09:28 Dep: 09:30 | Day 2 700 km | 8:02 PM 20:02 · Day 1 (Prior Day) | 7:30 AM 07:30 · Day 2 | ST Via Surat |
| 13 | Borivali · बोरीवलीBVI Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 11:08 Dep: 11:10 | Day 2 840 km | 8:02 PM 20:02 · Day 1 (Prior Day) | 7:30 AM 07:30 · Day 2 | ST Via Surat |
| 14 | Bandra Terminus · बांद्रा टर्मिनसBDTS Destination Terminal · अंतिम गंतव्य स्टेशन | Arr: 12:00 Dep: Ends | Day 2 859 km | 8:02 PM 20:02 · Day 1 (Prior Day) | 7:30 AM 07:30 · Day 2 | ST Via Surat |
1st Reservation Chart · पहला चार्ट कब बनता है?
Prepared at least 4 to 8 hours before departure (or the previous evening between 8:00 PM and 9:00 PM for morning trains departing before 12:00 PM). Most GNWL, RLWL, and RAC upgrades happen here.
ट्रेन छूटने से 4–8 घंटे पहले (और सुबह 12 बजे से पहले की ट्रेनों के लिए पिछली रात 8–9 बजे के बीच) पहला चार्ट तैयार होता है। ज़्यादातर वेटिंग (WL) व RAC टिकट इसी समय कन्फर्म होते हैं।
2nd (Vacancy) Chart · दूसरा वैकेंसी चार्ट क्या है?
Prepared 15 to 30 minutes before train departure at the charting station. It locks Current Booking (CURR_AVBL) seats, last-minute cancellations, and syncs to the TTE's Hand-Held Terminal.
ट्रेन छूटने से 15–30 मिनट पहले दूसरा (फ़ाइनल वैकेंसी) चार्ट लॉक होता है। इसमें करंट बुकिंग और अंतिम समय में रद्द हुई सीटें अपडेट होकर TTE के टैबलेट (HHT) पर जाती हैं।
Remote Charting Hub · रिमोट चार्टिंग स्टेशन क्यों ज़रूरी है?
Smaller or downstream halts do not prepare a separate chart; their quota is merged into an upstream Remote Charting Hub. Your ticket status locks when that upstream hub prepares its chart!
छोटे या आगे के स्टेशनों का अलग चार्ट नहीं बनता—उनका कोटा पिछले बड़े चार्टिंग हब (Remote Hub) से जुड़ा होता है, इसलिए आपका टिकट उसी बड़े स्टेशन के चार्ट समय पर लॉक हो जाता है!
Key charting summary, 1st & 2nd reservation chart locks, and remote charting hubs for Train 22952.
Complete station-by-station reservation chart preparation table from Gandhidham Bg (GIMB) to Bandra Terminus (BDTS).
| # | Boarding Station | Day | Arr / Dep | 1st Reservation Chart | 2nd (Vacancy) Chart | Charting Station (Hub) |
|---|---|---|---|---|---|---|
| 1 | Gandhidham BgGIMB1st Boarding · Origin 0 km from origin | Day 1 |
At the origin station Gandhidham Bg (GIMB), the 1st reservation chart for Train 22952 (Gimb Bdts Sfast) is prepared around —, and the 2nd (vacancy) chart is locked around — before its 9:00 PM departure.
Train 22952 (GIMB to BDTS) is divided into 7 charting zones: Gandhidham Bg (GIMB — 1st Chart —, 2nd Chart —); Bhachau Bg (BCOB — 1st Chart —, 2nd Chart —); Samakhiali B G (SIOB — 1st Chart —, 2nd Chart —); MORBI (MVI — 1st Chart —, 2nd Chart —); Ahmedabad Jn (ADI — 1st Chart 6:01 PM, 2nd Chart 3:45 AM); Vadodara Jn (BRC — 1st Chart 6:54 PM, 2nd Chart 5:38 AM); Surat (ST — 1st Chart 8:02 PM, 2nd Chart 7:30 AM).
On Train 22952, downstream stations mapped to an upstream remote charting hub include: Wankaner Jn (WKR → charted at Gandhidham Bg GIMB around 11:26 AM), Surendranagar (SUNR → charted at Gandhidham Bg GIMB around 11:26 AM), Viramgam Jn (VG → charted at Gandhidham Bg GIMB around 11:26 AM), Valsad (BL → charted at Surat ST around 8:02 PM). Always check your boarding station's assigned Charting Hub in the table above so you know the exact hour your WL/RAC ticket locks.
Check station-by-station reservation chart timings and remote charting hubs for major Indian Railways trains.
Calculate exact CRIS PRS bank refund with Double ₹5 Rounding before or after — chart lock for Confirmed (CNF), RAC, Waitlist (WL), or Tatkal tickets.
The first reservation chart for Gimb Bdts Sfast (22952) is prepared at Wankaner Jn (WKR) around 11:26 AM, with a second (vacancy) chart around 8:45 PM. 10 of 14 stations on the GIMB to BDTS route have published chart preparation times, listed station-by-station below; the remaining stations update closer to departure.
हिंदी में जानकारी (Chart Time Summary in Hindi):
ट्रेन 22952 Gimb Bdts Sfast के प्रारंभिक स्टेशन Gandhidham Bg (GIMB) का पहला चार्ट लगभग — और दूसरा वैकेंसी चार्ट — पर तैयार होता है। बीच के स्टेशनों का समय ऊपर बोर्डिंग स्टेशन चुनकर देखें।
Once your boarding station's chart is prepared, verify your final coach & berth on our 10-Digit IRCTC PNR Status Checker or track the train on 22952 Gimb Bdts Sfast Live Running Status.
Arr: Origin Dep: 21:00 |
| — IST · Day 1 |
| — IST · Day 1 |
Gandhidham Bg (GIMB) Primary Charting Hub |
| 2 | Bhachau BgBCOB 38 km from origin | Day 1 | Arr: 21:30 Dep: 21:32 | — IST · Day 1 | — IST · Day 1 | Bhachau Bg (BCOB) Primary Charting Hub |
| 3 | Samakhiali B GSIOB 53 km from origin | Day 1 | Arr: 21:50 Dep: 21:52 | — IST · Day 1 | — IST · Day 1 | Samakhiali B G (SIOB) Primary Charting Hub |
| 4 | MORBIMVI 145 km from origin | Day 1 | Arr: 23:32 Dep: 23:37 | — IST · Day 1 | — IST · Day 1 | MORBI (MVI) Primary Charting Hub |
| 5 | Wankaner JnWKR 174 km from origin | Day 2 | Arr: 00:20 Dep: 00:25 | 11:26 AM 11:26 IST · Day 1 (Prior Day) | 8:45 PM 20:45 IST · Day 1 (Prior Day) | Gandhidham Bg (GIMB) Remote Hub (GIMB) |
| 6 | SurendranagarSUNR 248 km from origin | Day 2 | Arr: 01:27 Dep: 01:29 | 11:26 AM 11:26 IST · Day 1 (Prior Day) | 8:45 PM 20:45 IST · Day 1 (Prior Day) | Gandhidham Bg (GIMB) Remote Hub (GIMB) |
| 7 | Viramgam JnVG 314 km from origin | Day 2 | Arr: 02:40 Dep: 02:42 | 11:26 AM 11:26 IST · Day 1 (Prior Day) | 8:45 PM 20:45 IST · Day 1 (Prior Day) | Gandhidham Bg (GIMB) Remote Hub (GIMB) |
| 8 | Ahmedabad JnADI 379 km from origin | Day 2 | Arr: 03:50 Dep: 04:00 | 6:01 PM 18:01 IST · Day 1 (Prior Day) | 3:45 AM 03:45 IST · Day 2 | Ahmedabad Jn (ADI) Primary Charting Hub |
| 9 | Vadodara JnBRC 479 km from origin | Day 2 | Arr: 05:48 Dep: 05:53 | 6:54 PM 18:54 IST · Day 1 (Prior Day) | 5:38 AM 05:38 IST · Day 2 | Vadodara Jn (BRC) Primary Charting Hub |
| 10 | SuratST 608 km from origin | Day 2 | Arr: 07:40 Dep: 07:45 | 8:02 PM 20:02 IST · Day 1 (Prior Day) | 7:30 AM 07:30 IST · Day 2 | Surat (ST) Primary Charting Hub |
| 11 | ValsadBL 676 km from origin | Day 2 | Arr: 08:48 Dep: 08:50 | 8:02 PM 20:02 IST · Day 1 (Prior Day) | 7:30 AM 07:30 IST · Day 2 | Surat (ST) Remote Hub (ST) |
| 12 | VapiVAPI 700 km from origin | Day 2 | Arr: 09:28 Dep: 09:30 | 8:02 PM 20:02 IST · Day 1 (Prior Day) | 7:30 AM 07:30 IST · Day 2 | Surat (ST) Remote Hub (ST) |
| 13 | BorivaliBVI 840 km from origin | Day 2 | Arr: 11:08 Dep: 11:10 | 8:02 PM 20:02 IST · Day 1 (Prior Day) | 7:30 AM 07:30 IST · Day 2 | Surat (ST) Remote Hub (ST) |
| 14 | Bandra TerminusBDTSDestination 859 km from origin | Day 2 | Arr: 12:00 Dep: End | 8:02 PM 20:02 IST · Day 1 (Prior Day) | 7:30 AM 07:30 IST · Day 2 | Surat (ST) Remote Hub (ST) |
Yes. Right after the 1st reservation chart is prepared (— at GIMB), any remaining vacant berths open under IRCTC Current Booking until the 2nd (vacancy) chart locks at —.
If your WL or RAC ticket on 22952 does not clear during the 1st chart (—), it remains eligible for last-minute cancellation upgrades in the 2nd vacancy chart (—). Fully waitlisted e-tickets after the 2nd chart are automatically cancelled and refunded by IRCTC.
Once your boarding station's chart is prepared, enter your 10-digit PNR on TravelAdda's PNR Status page to view your final coach and berth number, or open the 22952 Live Running Status page to track real-time delays, platform numbers, and coach position from the engine.
ट्रेन 22952 (Gimb Bdts Sfast) के प्रारंभिक स्टेशन Gandhidham Bg (GIMB) पर पहला रिज़र्वेशन चार्ट लगभग — बजे और दूसरा (वैकेंसी) चार्ट लगभग — बजे तैयार होता है। बीच के बोर्डिंग स्टेशनों का सटीक पहला और दूसरा चार्ट समय देखने के लिए ऊपर बोर्डिंग स्टेशन चुनें (English / हिंदी)।
Superfast · 1st & 2nd Chart Schedule