Compare 1,496+ routes, non-stop timings, T1/T2/T3 terminals & 14-day lowest fares (INR/USD/AED)
Track 500+ airlines by flight number with live terminal, gate & baggage belt
Check 7 kg / 15 kg airline baggage limits & calculate terminal arrival time
Check ₹5,000–₹20,000 DGCA / EU261 compensation & generate Nodal Officer claim
Spot your train's live GPS station, delay minutes, platform & coach position
Check real-time CNF, RAC, Waitlist & chart preparation status
Find 1st & 2nd (vacancy) chart times and remote charting station by stop
Calculate PRS verified CNF, RAC, WL, Tatkal & Vande Bharat Sleeper (72h/8h Gazette) refund
Find fastest & min-interchange routes, fares & timings across all 12 DMRC, Noida Aqua & Rapid Metro lines
The first reservation chart for Delhi - Ghaziabad EMU (64414) is prepared at Delhi Jn (DLI) around 8:00 PM, with a second (vacancy) chart around 8:10 AM. 5 of 5 stations on the DLI to GZB route have published chart preparation times, listed station-by-station below. (नीचे अपना बोर्डिंग स्टेशन चुनकर हिंदी और English में पहला व दूसरा चार्ट समय देखें।)
बोर्डिंग स्टेशन के अनुसार पहला और दूसरा रिज़र्वेशन चार्ट बनने का सटीक समय
Your Boarding Station (1st Station Default) · आपका बोर्डिंग स्टेशन (पहला स्टेशन डिफ़ॉल्ट)
Select boarding station (English / हिंदी) to see exact 1st & 2nd chart time
पुरानी दिल्ली (DLI) बोर्डिंग स्टेशन के लिए पहला और दूसरा रिज़र्वेशन चार्ट समय
8:00 PM
24-Hour IST: 20:00 hrs · Prev Day (Day 0)
Main chart when WL & RAC berths confirm, coach/seat numbers are allotted, and IRCTC SMS is sent.
इसी मुख्य चार्ट में WL और RAC टिकट कन्फर्म होते हैं व कोच/सीट नंबर SMS द्वारा मिलता है।
8:10 AM
24-Hour IST: 08:10 hrs · Day 1
Final chart (~30 mins before departure) locking Current Booking seats & TTE Hand-Held Terminal.
ट्रेन छूटने से ~30 मिनट पहले करंट बुकिंग (CURR_AVBL) और बची खाली सीटें लॉक होती हैं।
Prepared directly at Delhi Jn (DLI) PRS charting hub.
इस स्टेशन का चार्ट सीधे पुरानी दिल्ली (DLI) पर ही तैयार होता है।
Tap any station badge below to view its 1st & 2nd chart preparation timing above
Tap any boarding station row to view its details above · किसी भी स्टेशन पर क्लिक करके उसका चार्ट विवरण ऊपर देखें
| # | Boarding Station / बोर्डिंग स्टेशन | Arr / Dep · आगमन / प्रस्थान | Day & Dist · दिन व दूरी | 1st Chart / पहला चार्ट | 2nd Chart / दूसरा चार्ट | Charting Hub / चार्टिंग हब |
|---|---|---|---|---|---|---|
| 01 | Delhi Jn · पुरानी दिल्लीDLISelected 1st Boarding Station (Origin) · पहला बोर्डिंग स्टेशन (प्रारंभ) | Arr: Starts Dep: 08:40 | Day 1 0 km | 8:00 PM 20:00 · Prev Day (Day 0) | 8:10 AM 08:10 · Day 1 | DLI Self Charted |
| 02 | Delhi ShahdaraDSA Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 08:55 Dep: 08:56 | Day 1 6.6 km | 8:00 PM 20:00 · Prev Day (Day 0) | 8:10 AM 08:10 · Day 1 | DLI Via Delhi Jn |
| 03 | Viveka ViharVVB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 08:58 Dep: 08:59 | Day 1 9.2 km | 8:00 PM 20:00 · Prev Day (Day 0) | 8:10 AM 08:10 · Day 1 | DLI Via Delhi Jn |
| 04 | SahibabadSBB Intermediate Boarding Halt · बीच का बोर्डिंग स्टेशन | Arr: 09:06 Dep: 09:07 | Day 1 13.6 km | 8:00 PM 20:00 · Prev Day (Day 0) | 8:37 AM 08:37 · Day 1 | SBB Self Charted |
| 05 | Ghaziabad · गाज़ियाबादGZB Destination Terminal · अंतिम गंतव्य स्टेशन | Arr: 09:25 Dep: Ends | Day 1 20.4 km | 8:00 PM 20:00 · Prev Day (Day 0) | 8:37 AM 08:37 · Day 1 | SBB Via Sahibabad |
1st Reservation Chart · पहला चार्ट कब बनता है?
Prepared at least 4 to 8 hours before departure (or the previous evening between 8:00 PM and 9:00 PM for morning trains departing before 12:00 PM). Most GNWL, RLWL, and RAC upgrades happen here.
ट्रेन छूटने से 4–8 घंटे पहले (और सुबह 12 बजे से पहले की ट्रेनों के लिए पिछली रात 8–9 बजे के बीच) पहला चार्ट तैयार होता है। ज़्यादातर वेटिंग (WL) व RAC टिकट इसी समय कन्फर्म होते हैं।
2nd (Vacancy) Chart · दूसरा वैकेंसी चार्ट क्या है?
Prepared 15 to 30 minutes before train departure at the charting station. It locks Current Booking (CURR_AVBL) seats, last-minute cancellations, and syncs to the TTE's Hand-Held Terminal.
ट्रेन छूटने से 15–30 मिनट पहले दूसरा (फ़ाइनल वैकेंसी) चार्ट लॉक होता है। इसमें करंट बुकिंग और अंतिम समय में रद्द हुई सीटें अपडेट होकर TTE के टैबलेट (HHT) पर जाती हैं।
Remote Charting Hub · रिमोट चार्टिंग स्टेशन क्यों ज़रूरी है?
Smaller or downstream halts do not prepare a separate chart; their quota is merged into an upstream Remote Charting Hub. Your ticket status locks when that upstream hub prepares its chart!
छोटे या आगे के स्टेशनों का अलग चार्ट नहीं बनता—उनका कोटा पिछले बड़े चार्टिंग हब (Remote Hub) से जुड़ा होता है, इसलिए आपका टिकट उसी बड़े स्टेशन के चार्ट समय पर लॉक हो जाता है!
Key charting summary, 1st & 2nd reservation chart locks, and remote charting hubs for Train 64414.
Complete station-by-station reservation chart preparation table from Delhi Jn (DLI) to Ghaziabad (GZB).
| # | Boarding Station | Day | Arr / Dep | 1st Reservation Chart | 2nd (Vacancy) Chart | Charting Station (Hub) |
|---|---|---|---|---|---|---|
| 1 | Delhi JnDLI1st Boarding · Origin 0 km from origin | Day 1 |
At the origin station Delhi Jn (DLI), the 1st reservation chart for Train 64414 (Delhi - Ghaziabad EMU) is prepared around 8:00 PM, and the 2nd (vacancy) chart is locked around 8:10 AM before its 8:40 AM departure.
Train 64414 (DLI to GZB) is divided into 2 charting zones: Delhi Jn (DLI — 1st Chart 8:00 PM, 2nd Chart 8:10 AM); Sahibabad (SBB — 1st Chart 8:00 PM, 2nd Chart 8:37 AM).
On Train 64414, downstream stations mapped to an upstream remote charting hub include: Delhi Shahdara (DSA → charted at Delhi Jn DLI around 8:00 PM), Viveka Vihar (VVB → charted at Delhi Jn DLI around 8:00 PM), Ghaziabad (GZB → charted at Sahibabad SBB around 8:00 PM). Always check your boarding station's assigned Charting Hub in the table above so you know the exact hour your WL/RAC ticket locks.
Check station-by-station reservation chart timings and remote charting hubs for major Indian Railways trains.
Calculate exact CRIS PRS bank refund with Double ₹5 Rounding before or after 8:00 PM chart lock for Confirmed (CNF), RAC, Waitlist (WL), or Tatkal tickets.
The first reservation chart for Delhi - Ghaziabad EMU (64414) is prepared at Delhi Jn (DLI) around 8:00 PM, with a second (vacancy) chart around 8:10 AM. 5 of 5 stations on the DLI to GZB route have published chart preparation times, listed station-by-station below.
हिंदी में जानकारी (Chart Time Summary in Hindi):
ट्रेन 64414 Delhi - Ghaziabad EMU के प्रारंभिक स्टेशन Delhi Jn (DLI) का पहला चार्ट लगभग 8:00 PM और दूसरा वैकेंसी चार्ट 8:10 AM पर तैयार होता है। बीच के स्टेशनों का समय ऊपर बोर्डिंग स्टेशन चुनकर देखें।
Once your boarding station's chart is prepared, verify your final coach & berth on our 10-Digit IRCTC PNR Status Checker or track the train on 64414 Delhi - Ghaziabad EMU Live Running Status.
Arr: Origin Dep: 08:40 |
| 8:00 PM 20:00 IST · Prev Day (Day 0) |
| 8:10 AM 08:10 IST · Day 1 |
Delhi Jn (DLI) Primary Charting Hub |
| 2 | Delhi ShahdaraDSA 6.6 km from origin | Day 1 | Arr: 08:55 Dep: 08:56 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 8:10 AM 08:10 IST · Day 1 | Delhi Jn (DLI) Remote Hub (DLI) |
| 3 | Viveka ViharVVB 9.2 km from origin | Day 1 | Arr: 08:58 Dep: 08:59 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 8:10 AM 08:10 IST · Day 1 | Delhi Jn (DLI) Remote Hub (DLI) |
| 4 | SahibabadSBB 13.6 km from origin | Day 1 | Arr: 09:06 Dep: 09:07 | 8:00 PM 20:00 IST · Prev Day (Day 0) | 8:37 AM 08:37 IST · Day 1 | Sahibabad (SBB) Primary Charting Hub |
| 5 | GhaziabadGZBDestination 20.4 km from origin | Day 1 | Arr: 09:25 Dep: End | 8:00 PM 20:00 IST · Prev Day (Day 0) | 8:37 AM 08:37 IST · Day 1 | Sahibabad (SBB) Remote Hub (SBB) |
Yes. Right after the 1st reservation chart is prepared (8:00 PM at DLI), any remaining vacant berths open under IRCTC Current Booking until the 2nd (vacancy) chart locks at 8:10 AM.
If your WL or RAC ticket on 64414 does not clear during the 1st chart (8:00 PM), it remains eligible for last-minute cancellation upgrades in the 2nd vacancy chart (8:10 AM). Fully waitlisted e-tickets after the 2nd chart are automatically cancelled and refunded by IRCTC.
Once your boarding station's chart is prepared, enter your 10-digit PNR on TravelAdda's PNR Status page to view your final coach and berth number, or open the 64414 Live Running Status page to track real-time delays, platform numbers, and coach position from the engine.
ट्रेन 64414 (Delhi - Ghaziabad EMU) के प्रारंभिक स्टेशन Delhi Jn (DLI) पर पहला रिज़र्वेशन चार्ट लगभग 8:00 PM बजे और दूसरा (वैकेंसी) चार्ट लगभग 8:10 AM बजे तैयार होता है। बीच के बोर्डिंग स्टेशनों का सटीक पहला और दूसरा चार्ट समय देखने के लिए ऊपर बोर्डिंग स्टेशन चुनें (English / हिंदी)।
Superfast · 1st & 2nd Chart Schedule