Compare 1,496+ routes, non-stop timings, T1/T2/T3 terminals & 14-day lowest fares (INR/USD/AED)
Track 500+ airlines by flight number with live terminal, gate & baggage belt
Check 7 kg / 15 kg airline baggage limits & calculate terminal arrival time
Check ₹5,000–₹20,000 DGCA / EU261 compensation & generate Nodal Officer claim
Spot your train's live GPS station, delay minutes, platform & coach position
Check real-time CNF, RAC, Waitlist & chart preparation status
Find 1st & 2nd (vacancy) chart times and remote charting station by stop
Calculate PRS verified CNF, RAC, WL, Tatkal & Vande Bharat Sleeper (72h/8h Gazette) refund
Find fastest & min-interchange routes, fares & timings across all 12 DMRC, Noida Aqua & Rapid Metro lines
Track Train 12934 (Karnavati Express) live running status today. Operates from Ahmedabad Jn (ADI) to Bandra Terminus (BDTS), covering 482 km in 7h 30m with 11 halts. Departs ADI @ 05:00 & arrives BDTS @ 12:30.
Crossed Santa Cruz (STC) · 1 km ago
Next halt: Bandra Terminus (BDTS) in 0.8 km · ETA 12:18 PM · PF #4
Start: Thu, 26 Nov, 2026 · 482 km · 7h 30m · 11 Halts
Current Station
Santa Cruz (STC)
Crossed Santa Cruz (1 km ago)
Next Stop
Bandra Terminus (BDTS)
ETA 12:18 PM · PF #4 (0.8 km)
Speed
16 km/h
Avg 64.3 km/h
Distance Left
0.8 km
10/11 halts done
Track Your Boarding / Destination Station
Select your station for live ETA, distance left & platform number
Showing 11 of 97 stations · Tap 📍 on your stop to track ETA
Crossed Santa Cruz (STC) · 1 km ago
Next halt: Bandra Terminus (BDTS) in 0.8 km · ETA 12:18 PM · PF #4
Tap any station pin to view arrival & platform details
Tap or search your coach code to see standing order on the platform
Official route summary, running days, travel classes, distance, and average duration for Train 12934.
Station-by-station official time table from Ahmedabad Jn (ADI) to Bandra Terminus (BDTS) with arrival, departure, halt duration, platform, and distance.
| # | Station Name & Code | Arrival | Departure | Halt | Day | Platform | Distance |
|---|---|---|---|---|---|---|---|
| 01 | Ahmedabad JnADI |
Standard rake sequence of 23 units ordered from the front locomotive (ENG).
You can track 12934 Karnavati Express live at the top of this page. Currently, its status is "Crossed Santa Cruz (STC) · 1 km ago" (23 min Early). The interactive tracker shows real-time GPS station progress, next halt ETA, and platform numbers between Ahmedabad Jn (ADI) and Bandra Terminus (BDTS).
Train 12934 (Karnavati Express) operates from Ahmedabad Jn (ADI) to Bandra Terminus (BDTS). It covers a total railway distance of 482 km in 7h 30m with 11 commercial halts.
Train 12934 is scheduled to depart from Ahmedabad Jn (ADI) at 05:00 (05:00 AM) from Platform #7 and arrives at Bandra Terminus (BDTS) at 12:30 (12:30 PM) on Day 1 at Platform #4.
Explore live station schedules, platform numbers, and coach positions for major Indian Railways trains.
If Train 12934 is running more than 3 hours late at your boarding station and you do not travel, file an online TDR before departure for a 100% Full Fare Refund (₹0 deduction), or calculate your exact CRIS PRS cancellation refund.
Runs Daily (All 7 Days)
11 commercial halts
Train 12934 is the Karnavati Express, a daily superfast express service connecting Ahmedabad Jn (ADI) and Bandra Terminus (BDTS). Key intermediate stations along the route include Nadiad Jn (ND), Anand Jn (ANND), Vadodara Jn (BRC), Bharuch Jn (BH), Surat (ST), Navsari (NVS), Valsad (BL), Vapi (VAPI).
Looking for the return direction? Check Train #12933 Live Running Status & Time Table.
| Starts |
05:0005:00 AM |
| — |
| Day 1 |
| PF #7 |
| 0 km |
| 02 | Nadiad JnND | 05:3405:34 AM | 05:3605:36 AM | 1m | Day 1 | PF #1 | 46 km |
| 03 | Anand JnANND | 05:4905:49 AM | 05:5105:51 AM | 5m | Day 1 | PF #4 | 65 km |
| 04 | Vadodara JnBRC | 06:2306:23 AM | 06:2806:28 AM | 8m | Day 1 | PF #1 | 100 km |
| 05 | Bharuch JnBH | 07:1307:13 AM | 07:1507:15 AM | 5m | Day 1 | PF #4 | 171 km |
| 06 | SuratST | 08:0008:00 AM | 08:0308:03 AM | 8m | Day 1 | PF #2 | 230 km |
| 07 | NavsariNVS | 08:2508:25 AM | 08:2708:27 AM | 10m | Day 1 | PF #3 | 260 km |
| 08 | ValsadBL | 09:0809:08 AM | 09:1009:10 AM | 2m | Day 1 | PF #3 | 299 km |
| 09 | VapiVAPI | 09:3509:35 AM | 09:3709:37 AM | 8m | Day 1 | PF #2 | 325 km |
| 10 | BorivaliBVI | 11:1711:17 AM | 11:2011:20 AM | 8m | Day 1 | PF #9 | 464 km |
| 11 | Bandra TerminusBDTSDestination | 12:3012:30 PM | Ends | — | Day 1 | PF #4 | 482 km |
Train 12934 Karnavati Express runs Daily (Monday to Sunday). Always select the train's origin start date from Ahmedabad Jn (ADI) or use TravelAdda's Auto (Live) mode when checking overnight running status.
Along its route from ADI to BDTS, train 12934 halts at 11 stations including Nadiad Jn (ND), Anand Jn (ANND), Vadodara Jn (BRC), Bharuch Jn (BH), Surat (ST), Navsari (NVS), Valsad (BL), Vapi (VAPI). Full arrival, departure, halt duration, and platform details for every stop are listed in the schedule table above.
Train 12934 (Karnavati Express) offers General Unreserved (GN), AC Chair Car (CC), Second Sitting (2S). Its standard rake consists of 23 units ordered from the locomotive engine (ENG-LPR-GEN-GEN-C1-C2-C3-C4). The return service in the opposite direction is Train #12933.